What every file checks

Every Factum file runs the same 350 checks against the public record for the address. Each comes back Clear, Flag, or Not settled — and the file says which record answered it.

Register as of 2026-10-17 · 350 rows

Download the register (PDF)
A

Water and flood

20 rows
IdCheckWhat it does to the jobThe record that answers itLabel
A1FEMA flood zone (X, AE, AO, AH, A, V, VE)Cost: elevation, flood vents, engineered foundation; Stop in floodwayFEMA NFHL MapServer, parcel point-in-polygon, panel and effective datePR
A2Base flood elevation vs. finished-floor targetCost: fill or pier height; Change order when survey elevation differsNFHL BFE lines + USGS 3DEP elevation at the parcelPR / M
A3Regulatory floodwayStop: no net rise, often no buildingNFHL floodway layerPR
A4500-year (0.2 %) zoneCost: lender or city may require elevation anywayNFHL zone X-shadedPR
A5Local floodplain stricter than FEMA (Austin Atlas 14, Harris County 500-yr rule)Cost, Time: local permit reviewCity floodplain layer where published (Austin, Houston)PR / A / B
A6Coastal V / VE zoneCost: piles, breakaway walls, wind-flood loadNFHLPR
A7Coastal Barrier Resources System unitStop: no NFIP, lenders refuseUSFWS CBRS layerPR
A8Storm-surge zone (Cat 1–5)Cost: insurance, elevationNOAA SLOSH / state surge layers (TX GLO)PR
A9Levee-protected area and levee accreditationCost: residual-risk insurance; Time: mapping changesNFHL levee layer, USACE NLDPR
A10Dam inundation / Emergency Action Plan zoneCost: insurance; some cities restrictUSACE NID, state dam safety mapsPR / A / B
A11Repetitive-loss / NFIP claim history at the addressCost: insurance, buyer discountFEMA OpenFEMA claims by ZIP (address-level only via owner)PR (ZIP) / NS (PARCEL)
A12Stormwater detention required on siteCost: pond or vault; Time: drainage reviewCity drainage criteria manual threshold (impervious added)PR
A13Impervious-cover capChange order: footprint cut at plan checkZoning / watershed ordinance (Austin SOS)PR / A / B
A14Wetlands on or adjacent (NWI)Stop or Time: Corps delineation and 404 permitUSFWS National Wetlands Inventory layerPR
A15Waters of the US / stream on parcelTime: 404/401 permits, buffersNWI + USGS NHD flowlinesPR
A16Stream or creek setback / critical water quality zoneChange order: buildable area shrinksCity CWQZ / riparian buffer layersPR / A / B
A17Groundwater table depthCost: dewatering, waterproofing; Change order on basementsUSGS NWIS wells within 1 mi; soil survey water-table depthPR / M
A18Sea-level rise / tidal flooding trendCost: insurance horizon; lender scrutinyNOAA sea-level trends, NOAA high-tide floodingPR
A19Erosion hazard (coastal or riverine)Stop: setback lines (TX GLO beach access)State erosion-rate mapsPR
A20Drainage complaints / flooding history in the blockTime: neighbour objections, city conditions311 / service-request open data where publishedPR
B

Ground, soils and contamination

22 rows
IdCheckWhat it does to the jobThe record that answers itLabel
B1Expansive clay (shrink-swell, plasticity index)Cost: post-tensioned or pier-and-beam slab, moisture barriers; Change order after geotechUSDA NRCS Soil Data Access: linear extensibility, PIPR
B2Bearing capacity classCost: footing size; Change orderNRCS engineering propertiesPR / M
B3Depth to bedrockCost: rock excavation, blasting permits; Change orderNRCS depth-to-restrictive-layer; USGS geologyPR
B4Rock hardness / rippabilityChange order: unit-price rock clauseUSGS geologic map unitPR / M
B5Karst / sinkhole susceptibilityStop or Cost: geotech, grouting; Edwards zone rulesUSGS karst map; TX Edwards Aquifer recharge zonePR / A / B
B6Subsidence (groundwater withdrawal, mining, oil)Cost: foundation design; insuranceUSGS subsidence areas; Harris-Galveston Subsidence District; state mine mapsPR
B7Landslide susceptibilityStop or Cost: slope stability engineeringUSGS landslide inventory; state geologic surveyPR
B8Slope of the parcel (%)Cost: cut/fill, retaining walls, stepped foundationsUSGS 3DEP DEM across the parcelPR / M
B9Cut and fill volume for the footprintCost: haul-off or import; Change orderDEM + footprint (Modeled)M
B10Undocumented fill on siteChange order: remove and recompactHistoric aerials / topo change; NS without geotech
B11Liquefaction zoneCost: deep foundationsState seismic hazard zone maps (CA CGS); USGSPR / A / B
B12Corrosive soils (sulfates, chlorides, resistivity)Cost: sulfate-resistant cement, coated steelNRCS corrosion risk (concrete, steel)PR
B13Frost depthCost: footing depthState / county frost-line table (IRC Table R301.2)PR
B14Radon zoneCost: passive radon system where code requiresEPA radon zone by countyPR
B15Superfund / NPL site within 1 miCost: Phase I/II; lender scrutinyEPA Envirofacts / FRSPR
B16Brownfield, RCRA, or state VCP site on or adjacentTime: environmental covenants; Cost: vapour barrierEPA FRS; TCEQ Central RegistryPR
B17Leaking underground storage tank within 500 ftCost: Phase II; Change order if soils are impactedState LUST / PST registries (TCEQ PST)PR
B18Dry cleaner history on or adjacent (solvent plume)Cost: vapour mitigation; Stop on remediation listTCEQ Dry Cleaner Remediation Program list (already read)PR
B19Former landfill or dumpStop: methane, settlementState MSW registry; historic topoPR / A / B
B20Oil or gas well on or within 500 ft (plugged or active)Cost: setbacks, plugging verification; Stop if unpluggedTX RRC well layer; state equivalentsPR
B21Abandoned mine or quarry voidStop or Cost: groutingUSGS MRDS; state abandoned-mine landsPR
B22Agricultural history (pesticide, arsenic)Cost: Phase I; soil samplingHistoric aerials / land use; NS without sampling
C

Loads and climate

22 rows
IdCheckWhat it does to the jobThe record that answers itLabel
C1Seismic design category (A–F)Cost: lateral system, anchorageUSGS seismic design web service (ASCE 7 values by lat/lon)PR
C2Active fault zone (Alquist-Priolo or state equivalent)Stop: setback from trace; Time: fault studyCA CGS zones; USGS Quaternary faultsPR
C3Design wind speed (ASCE 7 risk category II)Cost: roof tie-downs, glazingASCE 7 hazard values via USGS/ATC service; county tablesPR / A / B
C4Hurricane-prone region / windborne-debris regionCost: impact glazing or shuttersIBC/IRC map by distance from coast and wind speedPR
C5Texas windstorm (TWIA) designated catastrophe areaCost: WPI-8 inspections, certified construction; insuranceTDI TWIA designated area list by county/cityPR
C6Tornado frequency (county, 20-yr)Cost: safe room option, insuranceNOAA Storm Events databasePR
C7Hail frequency and size (county)Cost: Class 4 roofing credit, insuranceNOAA Storm Events; NCEI hailPR
C8Ground snow loadCost: roof framingASCE 7 snow by lat/lon; state tablesPR / A / B
C9Ice load / freezing rain regionCost: overhead lines, roofsASCE 7 ice mapPR
C10Design rain intensity (NOAA Atlas 14)Cost: drainage sizing, detentionNOAA Atlas 14 point precipitationPR
C11Heat days > 100 °F per yearTime: lost productivity, OSHA heat rules; Cost: concrete admixturesNOAA NCEI normals (already read)PR
C12Freeze daysTime: concrete curing windowsNOAA normals (already read)PR
C13Rain days by month and the build windowTime: weather days (already modeled)NOAA normalsPR / M
C14Lightning densityCost: protection system on tall or exposed structuresNOAA / Vaisala county densityPR
C15Wildfire hazard severity zone / WUICost: Chapter 7A ignition-resistant assemblies, defensible space; insurance availabilityCAL FIRE FHSZ; USFS Wildfire Risk to Communities; TX A&M wildfire riskPR
C16Wildfire history within 5 mi (10 yr)Cost: insurance; lenderNIFC fire perimetersPR
C17Smoke-season work stoppage daysTimeEPA AirNow history by countyPR
C18Drought stage / water restrictionsTime: landscaping, dust control waterState water board drought monitor; city stagePR
C19Hurricane-season moratoria (coastal crane, roofing)Time: June–November windowsCity/county ordinances where publishedPR
C20Climate zone (IECC)Cost: insulation, glazing U-valuesIECC climate zone by countyPR
C21Extreme-precipitation trend (Atlas 14 vs. older design)Change order: drainage resized at reviewNOAA Atlas 14 revisions by statePR
C22Solar resource (for solar mandate or payback)Cost: PV sizing (already modeled via PVWatts)NREL PVWattsPR / M
D

Access and logistics

20 rows
IdCheckWhat it does to the jobThe record that answers itLabel
D1Legal access: frontage on a public street or recorded access easementStop: landlocked parcels need an easementParcel polygon vs. road centerlines; county deed indexPR / NS
D2Driveway on a state highway (TxDOT / Caltrans access permit)Time: 60–120 days; Cost: turn laneRoad ownership layer (TxDOT roadways)PR
D3Road width and truck access (concrete trucks, 45-ft trailers)Cost: pump truck, smaller loadsRoad class / width from city GIS; Street View readPR / M / A / C
D4Posted weight limits and bridges on the routeCost: split loadsState bridge inventory (NBI) on the approachPR
D5Low overhead clearance on the routeCost: route change for modular / steelNBI vertical clearancePR
D6Overhead power lines over the lot (OSHA 10-ft rule)Cost: line cover-up or de-energise, crane limitsStreet View read; utility layerM
D7Distance to nearest ready-mix plantCost: delivery surcharge; Time: 90-minute slump limitPlant locations (NRMCA/state registry) + drive timePR / M
D8Haul distance to landfill or C&D recyclerCost: disposalState MSW facility registry + drive timePR / M
D9Crane setup and swing roomCost: tower vs. mobile; street closureParcel size + Street View (Modeled)M
D10On-site staging and laydown areaCost: off-site storage, just-in-time deliveriesParcel area minus footprintM
D11Street or sidewalk closure permit neededCost, Time: ROW permits, flaggersCity ROW permit rules; lot frontagePR
D12Noise ordinance and permitted work hoursTime: shorter days, no SundayCity code (published); school/hospital proximityPR
D13School or hospital within 500 ftTime: hour limits, haul restrictionsOSM/HIFLD schools and hospitalsPR
D14Zero-lot or shared-wall neighbourCost: shoring, underpinning, party-wall agreementsParcel adjacency and building footprintsPR / M
D15Protected tree canopy over the work areaCost: arborist, fencing, root-zone restrictionsCity tree layer where published; aerial readPR / M / A / C
D16Steep driveway grade (> 12 %)Cost: regrading; delivery limitsDEM along the driveM
D17Remote site (> 45 min from a town of 10,000)Cost: mobilisation, per diemCensus places + drive timePR / M
D18Island, ferry or seasonal roadCost, TimeRoad network / ferry routesPR
D19Snow-season access closureTimeState DOT seasonal closuresPR
D20Parking for crews (urban)Cost: permits, shuttlesCity parking rules; densityM
E

Utilities and connections

22 rows
IdCheckWhat it does to the jobThe record that answers itLabel
E1Public water available at the lot lineStop or Cost: main extension, wellUtility service-area layers (TWDB, city GIS)PR
E2Water meter size and upsizing feeCost: meter and impact feeUtility fee schedule (Austin Water already read)PR / A / B
E3Fire-flow at the nearest hydrantCost: sprinklers or tank; Stop for larger buildingsHydrant layer + flow test records where publishedPR / NS
E4Distance to nearest hydrantCost: new hydrant if > 500 ft (IFC)City hydrant GISPR
E5Sanitary sewer availableCost: extension or septicUtility layersPR
E6Sewer capacity / moratorium or wet-weather restrictionStop or TimeUtility notices; capacity letters (NS without request)PR / NS
E7Septic required: soil percolation and lot sizeCost: aerobic system; Stop on clay or small lotsNRCS septic suitability; county OSSF rulesPR / A / B
E8Lift station needed (grade below sewer)Cost, maintenanceDEM vs. sewer invert (M)M
E9Natural gas service in the streetCost: all-electric design or propaneUtility service map where publishedPR / NS
E10Electric service capacity and transformer lead timeTime: 6–18 months for new transformers (2024–26 shortage)Utility published lead times; national shortage dataPR / M
E11Overhead-to-underground service conversion requiredCostCity undergrounding ordinancePR
E12Utility easements crossing the buildable areaChange order: footprint movedRecorded plat (county) / utility GISPR / NS
E13Utility relocation (pole, pedestal, main) in the wayCost, Time: utility schedulingStreet View read; utility GISM
E14Impact fees by utility (water, wastewater, roadway, parks)CostCity impact-fee schedulePR
E15Stormwater connection or on-site discharge rulesCostDrainage criteria manualPR
E16Backflow prevention requirementCostUtility rulesPR
E17Fibre / telecom availabilityCost for commercial; tenant demandFCC broadband mapPR
E18Solar interconnection queue and limitsTime: months; Cost: export capsUtility interconnection rules; PUC dataPR
E19EV-ready or EV-capable code requirementCostLocal energy/green codePR
E20Well permit and groundwater district rulesTime, CostState groundwater conservation districtPR
E21Water rights or allocation (western states)StopState water rights databasePR / A / B
E22Utility shutdown windows for tie-ins (occupied buildings)TimeNS without the utility's schedule
F

Zoning, overlays and private restrictions

26 rows
IdCheckWhat it does to the jobThe record that answers itLabel
F1Zoning district permits the use by rightStop or Time: rezoning 6–12 monthsCity zoning GIS (Austin already read)PR
F2Conditional-use or special-use permit neededTime: hearings 3–6 monthsZoning code use tablePR / B / C
F3Variance likely needed (setback, height, lot size)Time, risk of denialZoning dimensions vs. assumed scope (M)PR / M
F4Front, side, rear setbacksChange order: footprintZoning code by districtPR / A / B
F5Height limit and storiesChange orderZoning codePR / A / B
F6Lot coverage / FAR capChange orderZoning codePR / A / B
F7Impervious cover cap (watershed)Change orderWatershed ordinancePR / A / B
F8Minimum lot size and widthStop for subdivisionZoning code vs. parcelPR
F9Parking minimum or maximumCost: structured parking; Change orderZoning code (Austin removed minimums 2023)PR
F10Density cap (units/acre)Stop or scope cutZoning codePR
F11ADU rules (size, height, owner-occupancy, parking)Stop or Change orderState statute + local ordinance (Part 17 matrix)PR
F12Short-term rental restrictions (if the pro forma assumes it)Cost: revenueCity STR ordinancePR
F13Historic district or landmark designationTime: commission review; Cost: materialsNRHP; local landmark layersPR
F14Design review / architectural review boardTime: 1–3 monthsOverlay layer; city codePR / A / B
F15HOA / CC&Rs / deed restrictionsStop or Change order: materials, height, ADU bansCounty deed index (NS by API); HOA layer where publishedNS / PR
F16PUD or planned-development conditionsChange orderPUD ordinancePR
F17Platting or re-subdivision requiredTime: 3–9 monthsPlat status in county/city GISPR
F18Legal lot of recordStopPlat recordsPR / NS
F19Non-conforming use or structureChange order: loss of grandfathering on rebuild > 50 %Zoning code; assessor year builtPR / B / C
F20Building or utility moratorium in forceStopCity noticesPR
F21ETJ or annexation status (county vs. city rules)Time: dual reviewCity limits + ETJ layersPR
F22Inclusionary / affordable set-aside triggersCostCity ordinance by unit countPR
F23Tree preservation ordinance (protected diameters, mitigation fees)Cost, Change orderCity code; tree survey requiredPR
F24Airport overlay (height, noise contours, FAA 7460)Time: FAA 45 days; Cost: sound attenuationFAA airports + Part 77 surfaces; noise contoursPR
F25Dark-sky, sign, and fence codesCost, Change orderCity codePR
F26Corridor / transit-oriented overlay incentives or rulesCost or benefitOverlay layersPR
G

Permits, reviews and agency approvals

26 rows
IdCheckWhat it does to the jobThe record that answers itLabel
G1Permit turnaround, median and p90 for this kindTime (already in section 03)City permit dataset (Socrata)PR
G2Plan-check cycles typical (comments rounds)Time: 2–4 weeks per roundPermit dataset where review dates existPR / M
G3Expedited or third-party review availableTime saved; CostCity programme pagesPR
G4Fire marshal review required (sprinklers, access, hydrants)Time, CostOccupancy and size thresholds in fire codePR
G5Health department review (food service, pools)Time: 2–6 weeksKind of usePR
G6Accessibility review (TX TAS for projects > $50,000; CA CASp)Time, Cost: registered accessibility specialistTDLR rulesPR
G7Energy-code compliance path (IECC, Title 24)Cost: modelling, HERS/Title 24 reportsState adopted codePR
G8Asbestos survey before demolition or renovation (TX law for public/commercial; EPA NESHAP)Time: 1–3 weeks; Cost: abatementTDSHS rules; building agePR
G9Lead-based paint (pre-1978) RRP rulesCostAssessor year builtPR
G10Demolition permit and notificationTime: 10-day NESHAP noticeCity rulesPR
G11NPDES / TPDES stormwater permit (>= 1 acre disturbed)Time: SWPPP; Cost: controlsDisturbed area (M) vs. 1-acre rulePR / M
G12Corps of Engineers Section 404 / state 401Time: 6–18 monthsNWI / NHD hit (A14–A15)PR
G13State highway driveway or utility permitTimeD2PR
G14Railroad crossing or right-of-way agreementTime: monthsFRA rail lines within 100 ftPR
G15FAA Form 7460 (height near airport)Time: 45–90 daysF24PR
G16Coastal commission / GLO beachfront permitTime: monthsCoastal zone layersPR
G17Section 106 / SHPO review if federal money or permitTimeFunding source (DP) + NRHPPR / DP
G18Tribal consultation / cultural resources surveyTimeTHC/SHPO high-probability areasPR
G19Environmental review (CEQA / NEPA / state)Time: 6–24 monthsKind, size, fundingPR
G20School district and park feesCostDistrict fee schedulesPR
G21Dewatering discharge permitTime, CostA17 water tablePR / M
G22Elevator permit and state inspectionTimeStories/kindPR
G23Certificate-of-occupancy prerequisites (fire, health, utilities)Time: 2–6 weeksCity CO checklistPR
G24Inspection scheduling lead timeTime: days per inspection × countPermit dataset inspection recordsPR / M
G25Re-inspection rate for this kind in this cityTime, CostPermit datasetPR
G26Permit fee schedule (valuation-based)Cost (already in Hidden cost)City fee schedulePR / A / B
H

Existing building and site conditions

24 rows
IdCheckWhat it does to the jobThe record that answers itLabel
H1Year built (asbestos era < 1981, lead < 1978, knob-and-tube < 1950)Cost: abatement; Time: surveysAssessor recordPR
H2Structural system and condition classCost: unknown behind wallsAssessor (construction class); NS without inspectionPR / NS
H3Prior additions and whether permittedChange order: bring to code; Stop on unpermitted workPermit history vs. assessor square footagePR
H4Open permits or code violations on the parcelStop: must close firstCity permit / code enforcement datasetsPR
H5Recorded liens or noticesStop: titleCounty records (NS by API)
H6Historic designation of the structureTime, CostNRHP / local landmarkPR
H7Occupied during construction (phasing)Time: 20–40 % longer; CostDeclared on intake (DP)DP
H8Party walls or shared structureCost: agreements, shoringFootprint adjacencyPR / M
H9Shared utilities with a neighbourCost: separationNS without survey
H10Underground storage tank (heating oil, former station)Cost: removalState PST registry; historic usePR
H11Prior fire, flood, or storm damage claimsCost: hidden damageNFIP claims (ZIP); NS at parcelPR / NS
H12Foundation type and known movementCost: repair before buildAssessor foundation field; NSPR / NS
H13Roof age and typeCost (rebuild/addition tie-ins)Permit history (roof permits)PR
H14Electrical panel type (FPE, Zinsco, aluminium branch wiring)Cost: replacementNS without inspection; era inference (M)NS / M
H15Plumbing material (galvanised, polybutylene, cast iron)Cost: repipeEra inference (M)M
H16Septic system age and permitCost: replacementCounty OSSF permitsPR / A / B
H17Well age and water qualityCostState well reportsPR
H18Termite / wood-destroying insect zoneCost: treatment, borateIRC termite infestation probability mapPR
H19Mould or moisture historyCostNS
H20Grandfathered systems that lose status on major alteration (sprinklers, egress)Change orderCode alteration thresholds (Chapter 34 / IEBC)PR
H21Existing drainage failures / negative gradingCostStreet View / aerial read (M)M
H22Encroachments over the lot line (fences, eaves, driveways)Stop or Cost: survey, agreementsAerial / parcel overlay (M); NS without surveyM / NS
H23Easements across the structure footprintStopPlat (NS by API)
H24Prior permits denied or withdrawn at this addressTime: history repeatsPermit datasetPR
I

Design and scope risk

26 rows
IdCheckWhat it does to the jobThe record that answers itLabel
I1No geotechnical report yetChange order: foundation redesign (the most common surprise)Declared on intake; files readDP
I2No boundary / topographic survey yetChange order: setbacks, gradingDPDP
I3Drawings incomplete (no MEP, no structural)Cost: allowances, bid spreadFiles read: sheet index (M)M
I4Allowances as share of contractChange order exposureBid or estimate lines readDP / M
I5Owner-furnished itemsTime: coordinationDPDP
I6Long-lead items in scope (switchgear, elevators, custom glazing, transformers)Time: 20–60 weeksScope read (M) + lead-time tableM
I7Structural steel or long clear spansCost, lead timeScopeM
I8Basement or below-grade workCost: waterproofing, dewatering; A17ScopeM
I9Retaining walls over 4 ft (engineered, permitted)Cost, TimeDEM + footprint (B8)M
I10Slope over 15 % under the footprintCost: stepped foundations, hillside rulesDEMPR / M
I11Cantilevers, curtain wall, atria, unusual geometryCost, engineeringScope / renderingsM
I12Pool or spaCost, barrier code, separate permitScopeDP
I13Fire sprinklers required (NFPA 13D for new homes in some cities; commercial thresholds)Cost: $3–6/sfLocal amendment tablePR
I14Solar-ready or solar mandate (CA Title 24, some cities)CostState / city codePR
I15ADA / accessibility scope (commercial, multifamily FHA)CostKind and unit countPR
I16Acoustic requirements (airport, highway, rail)Cost: STC assembliesF24, O3PR
I17Green-building or LEED mandate (city-owned, incentives)Cost 1–4 %City programmePR
I18Concrete / ICF / mass timber / SIPs systemCost, lead time, crew availabilityScopeM
I19Modular or prefab transport (route, crane)Cost: D4–D5ScopeM
I20Custom or imported finishesLead time, tariffsScopeM
I21Elevator or liftCost, lead 30–52 weeks, permitsStories / scopeM
I22Generator, battery, or microgridCost, interconnectionScopeM
I23Scope-to-budget mismatch (stated budget vs. modeled total)Change order pressureDP budget vs. totalM
I24Value-engineering candidatesCost downLine items (M)M
I25Specification conflicts between sheetsChange orderFiles read (M)M
I26Phasing or early packages (foundation permit before full set)Time saved; Cost of reworkScopeM
J

Labor and market

16 rows
IdCheckWhat it does to the jobThe record that answers itLabel
J1Construction wage rates (already in the cost model)CostBLS OEWS by MSAPR
J2Construction unemployment / labour tightness in the MSACost: overtime; TimeBLS LAUS / CES construction employment trendPR
J3Prevailing wage or Davis-Bacon applies (public money)Cost 10–30 % on labourFunding source (DP) + WDOL ratesDP / PR
J4Union market share for the tradeCostBLS union membership by statePR
J5Mega-projects within 50 mi drawing crews (fabs, plants, data centres)Cost, TimePublic announcements / permits > $500M in corpusPR / A / C
J6Subcontractor depth for specialty trades (elevator, curtain wall)TimeLicensing board counts by countyPR / A / B
J7Contractor licence and insurance verification (where a bidder is named)StopState licensing board (TDLR, CSLB)PR
J8Bonding capacity vs. contract sizeStopSurety letter (DP)DP / NS
J9Seasonality: regional construction employment by monthTimeBLS CES seasonal patternPR
J10Holiday and weather windows in the scheduleTimeCalendar + C11–C13M
J11Per-diem and lodging for remote sitesCostGSA per-diem rates + D17PR / M
J12Overtime assumptions in the bidCostBid readDP
J13Immigration-enforcement disruption risk (regional reports)TimeNews corpus (C)M
J14Trade-school and apprenticeship pipeline (long builds)TimeDOL apprenticeship dataPR
J15Local hire or MWBE requirements (public)Cost, TimeAgency rules (DP)DP / PR
J16Competing bids on the same letting (crowding)CostLetting records (already in corpus)PR
K

Materials and supply

20 rows
IdCheckWhat it does to the jobThe record that answers itLabel
K1Lumber price index trend (12-month)CostBLS PPI WPU081PR
K2Steel mill products indexCostBLS PPI WPU1017PR
K3Ready-mix concrete index and regional cement supplyCostBLS PPI WPU1332; USGS cement reportsPR
K4Gypsum, insulation, roofing indicesCostBLS PPI seriesPR
K5Copper and wireCost, theft riskBLS PPI; LMEPR
K6Switchgear and transformer lead timesTime: 30–80 weeksUtility and industry notices (B table)PR / M
K7HVAC refrigerant transition (A2L, 2025+) equipment availabilityCost, leadEPA AIM rule datesPR
K8Windows and curtain wall lead timesTime: 12–30 weeksIndustry tableM
K9Tariffs on steel, aluminium, lumber, cabinets in forceCostUSITC / CBP noticesPR
K10Freight and fuel surcharge trendCostEIA diesel; Cass freight indexPR
K11Distance to ready-mix and asphalt plants (D7)CostRegistriesPR / M
K12Aggregate and sand availability (regional shortages)CostUSGS minerals; state quarry registryPR
K13Material theft risk (site crime, O1)Cost: security, insuranceCrime dataPR
K14Laydown and secure storage (D10)CostParcel areaM
K15Escalation clause in the contractChange order mechanismBid readDP
K16Allowance adequacy vs. local price (finishes)Change orderAllowances vs. corpus pricesM
K17Substitution clauses and approved equalsChange orderSpec readDP / M
K18Local sourcing requirements (Buy America for public)Cost, TimeFunding (DP)DP / PR
K19Hazardous-material disposal rates (asbestos, contaminated soil)CostState disposal facilitiesPR
K20Concrete temperature limits (hot/cold weather placement days)TimeC11–C12PR / M
L

Schedule drivers

20 rows
IdCheckWhat it does to the jobThe record that answers itLabel
L1Permit issuance time (G1)TimePermit datasetPR
L2Inspection count for the kind × lead per inspection (G24)TimePermit datasetPR / M
L3Weather days in the build window (C13)TimeNOAA normalsPR / M
L4Long-lead deliveries on the critical path (I6, K6–K8)TimeLead-time tableM
L5Utility connection lead (E10, E18)TimeUtility noticesPR / M
L6Design decisions outstanding (selections, allowances)TimeDP / files readDP / M
L7Financing draw schedule and inspectionsTime: 1–2 weeks per drawDPDP
L8Lien-waiver and pay-app cycle (TX 10 % retainage)Time, cashState statutePR
L9Holiday calendar in the windowTimeCalendarM
L10Curing and placement temperature windows (K20)TimeNOAAPR / M
L11Dry-in before the wet seasonTime riskNOAA monthly rainPR / M
L12Hurricane-season crane and roofing moratoria (C19)TimeCity rulesPR
L13Bird-nesting season limits on tree removal (MBTA, local)Time: Feb–AugUSFWS guidance; city tree rulesPR
L14Endangered-species seasonal windows (P1–P3)TimeUSFWSPR
L15Burn bans and dust-control stages (C18)TimeCounty noticesPR
L16Re-inspection rate (G25)TimePermit datasetPR
L17Concurrent projects by the same contractor (capacity)TimePermit dataset by contractorPR
L18Phased occupancy sequencing (H7)TimeDPDP
L19Material delivery access windows (D11–D13)TimeCity rulesPR
L20Completion history: median days by kind and valuation band (already in section 03)TimePermit datasetPR
M

Change-order triggers

22 rows
IdCheckWhat it does to the jobThe record that answers itLabel
M1Differing-site-conditions clause present and its notice periodChange order exposureContract / bid readDP
M2Unit-price items for rock, unsuitable soil, dewateringExposure sized by quantityBid read + B3, B10, A17DP / M
M3Allowance lines and their realism (I4, K16)OverrunBid readDP / M
M4Owner-added scope history for this kind (median change-order %)ExposurePermit valuation revisions in corpus (M)M
M5Code-official interpretation risk (new code cycle adopted < 12 months)Change orderState/city code adoption datesPR
M6Plan errors and omissions exposure (I3, I25)Change orderFiles readM
M7Utility conflicts found at excavation (E12–E13)Change orderUtility GISPR / M
M8Survey discrepancies (I2, H22)Change orderNS until survey
M9Rock encountered (B3–B4)Change orderUSGS/NRCSPR / M
M10Water table encountered (A17)Change orderUSGSPR / M
M11Contamination encountered (B15–B19)Change order, StopEPA/TCEQPR
M12Structural surprises in existing buildings (H2, H3)Change orderPermit historyPR / NS
M13Substitutions when long-lead items slip (K17, I6)Change orderSpec readDP / M
M14Failed inspections and corrective work (G25)Change orderPermit datasetPR
M15Design-build scope gapsChange orderContract type (DP)DP
M16Late finish selections and upgradesChange orderDPDP
M17As-built vs. drawing mismatch on renovationsChange orderH3PR / NS
M18Conditions of approval added at permit (tree mitigation, sidewalks, undergrounding)Change orderCity conditions patterns (C)PR / M
M19Impact-fee reassessment at permitCostE14PR
M20Escalation clause triggers (K15)CostContract readDP
M21Weather-delay compensable vs. excusable termsTime/CostContract readDP
M22Retainage release and final-payment conditions (L8)Cash timingState statutePR
N

Title, districts, insurance and money

22 rows
IdCheckWhat it does to the jobThe record that answers itLabel
N1Owner of record is an entity, trust, or estate (signature authority)Time: closingAssessor owner type (never printed by name)PR
N2Severed mineral rights (Texas) and surface-use rulesStop risk: operator access rightsCounty records (NS); RRC leases nearby (B20)NS / PR
N3Pipeline easement on or adjacent (PHMSA)Stop: setbacks; CostPHMSA NPMS public viewer (county), state layersPR / A / B
N4High-voltage transmission corridorCost: setbacks, EMF buyer resistanceHIFLD transmission linesPR
N5Planned road widening or transit project touching the parcelStop: taking; TimeTxDOT / city CIP project lists (already in corpus)PR
N6Special districts: MUD, PID, TIRZ, LID (Texas) — taxes and bond obligationsCost: tax rate; TimeCounty appraisal district taxing unitsPR
N7Special assessments or paving liensCostCity recordsPR / NS
N8Property-tax reassessment on completion (rate × added value)Cost: carryingAppraisal district ratePR / M
N9Tax abatement, opportunity zone, enterprise zoneBenefitCensus tract OZ list; city programmesPR
N10NFIP / private flood insurance availability and estimated premium bandCostA1 + FEMA Risk Rating 2.0 bandsPR / M
N11Wildfire insurance availability (CA FAIR Plan dependence)Cost, lenderC15 + state insurer-of-last-resort dataPR
N12Windstorm insurance (TWIA) requirement and certificationCostC5PR
N13Builder's-risk premium band for the regionCostIndustry table by hazard tierM
N14Surety / performance bond requirement (public)Cost 1–3 %Agency rules (DP)DP / PR
N15Lien law: Texas constitutional mechanic's lien on homestead needs a signed contract before workStopState statutePR
N16Retainage statute (TX 10 %; public 5 %)CashState statutePR
N17Prompt-payment act termsCashState statutePR
N18Sales tax on materials vs. labour (TX residential repair vs. new)Cost 6.25–8.25 %State comptroller rulesPR
N19Homestead or agricultural exemption lost on change of useCostAppraisal districtPR
N20HOA assessments and architectural feesCostF15
N21Lender requirements common for the kind (survey, elevation certificate, Phase I)TimeKind rules (B)M
N22Appraisal gap risk: modeled cost vs. comparable salesFinancing riskAssessor sales / FMR (M)M
O

Neighborhood and context

14 rows
IdCheckWhat it does to the jobThe record that answers itLabel
O1Property crime rate near the siteCost: fencing, security, theft insuranceCity crime open data within 0.5 miPR
O2Construction-site theft reports in the areaCostCrime data filtered by premise typePR
O3Highway, rail or industrial noiseCost: acoustic glazing (I16)DOT noise maps; FRA linesPR
O4Neighbourhood opposition history (recent zoning cases contested)TimeCity case recordsPR / A / C
O5Neighbouring construction at the same time (shared street, cranes)Time, logisticsActive permits within 500 ftPR
O6Vacancy and absorption for the use (TI, development)Revenue riskCensus ACS vacancy; HUDPR
O7Rent for the unit type (HUD FMR by ZIP)Revenue (pro forma)HUD FMRPR
O8Comparable sales and assessed values on the blockAppraisal gap (N22)Assessor recordsPR
O9Population and household growth (5-yr)DemandCensus ACSPR
O10Walk / transit access (for density bonuses, parking waivers)BenefitGTFS stops within 0.25 miPR
O11Industrial neighbours: odour, emissions, hazardous facilities (RMP, TRI)Cost, buyer riskEPA TRI and RMP facilitiesPR
O12Cell tower, substation or water tower adjacentBuyer riskFCC ASR; HIFLDPR
O13Emergency response: fire station distance and ISO classInsurance costHIFLD fire stations; ISO PPC where publishedPR / M
O14Recent disaster declarations in the county (5 yr)Insurance, lenderFEMA disaster declarationsPR
P

Ecology and heritage

12 rows
IdCheckWhat it does to the jobThe record that answers itLabel
P1Endangered-species range (e.g. golden-cheeked warbler, Barton Springs salamander)Time: USFWS consultation, seasonal windowsUSFWS IPaC by locationPR
P2Designated critical habitat on or adjacentStop or TimeUSFWS critical habitat layerPR
P3Habitat conservation plan participation fee (e.g. Balcones Canyonlands)CostCounty HCP mapPR
P4Heritage or protected trees on the lotCost: mitigation fees, redesignCity tree ordinance + canopy (F23)PR / M
P5National Register property or districtTime: reviewNRHPPR
P6State archaeological landmark or high-probability zoneTime: surveyTHC / SHPO atlas (restricted; NS)NS / PR
P7Cemetery on or adjacent (Texas cemetery law)StopTHC cemetery layerPR
P8Edwards Aquifer recharge or contributing zone (TCEQ rules)Cost: WPAP, TimeTCEQ Edwards layersPR
P9Coastal zone or barrier dune protectionsTimeGLO coastal layersPR
P10Migratory bird nesting in trees to be removed (L13)TimeUSFWS guidancePR
P11Invasive-species or quarantine soil movement rulesCostUSDA APHIS quarantinesPR
P12Prime farmland or conservation easementStopNRCS prime farmland; NCEDPR
Q

Tenant improvement and occupancy triggers

16 rows
IdCheckWhat it does to the jobThe record that answers itLabel
Q1Change of occupancy group (e.g. retail M to restaurant A-2)Cost: full code upgrade; Change orderPrior and proposed use vs. IBCPR / DP
Q2Alteration level (IEBC Level 1–3) triggering upgradesCostScope vs. IEBCM
Q3Accessibility upgrade spend (20 % path-of-travel rule)CostADA 28 CFR 35/36PR
Q4Sprinkler retrofit trigger by occupant load or areaCost: $4–8/sfIFC thresholdsPR
Q5Fire alarm upgrade triggerCostIFCPR
Q6Exit count and egress width for new occupant loadChange order: added exitsIBC Ch. 10PR / M
Q7Restroom fixture count for the new loadCost: added fixturesIPC Table 403.1PR / M
Q8Grease interceptor sizing (food service)Cost $15–60kUtility pretreatment rulesPR
Q9Kitchen hood, shaft and roof penetrationCost, structuralIMC; roof readPR / M
Q10Electrical service upgrade (amps) for the useCost, Time (E10)Scope vs. existing serviceM
Q11HVAC tonnage and roof structure for new unitsCost, structuralScopeM
Q12Landlord work letter and TI allowance vs. modeled costChange order / funding gapLease (DP)DP
Q13Landlord approvals and building rules (hours, freight elevator, union)Time, CostLease (DP)DP / NS
Q14Shell condition delivered (cold dark shell vs. vanilla)CostLease (DP)DP
Q15Parking change-of-use requirementChange orderZoning (F9)PR
Q16Signage permit and landlord sign criteriaTimeCity sign codePR