Skip to content
Factum Report · The public recordfactumreport.com
Factum ReportFactum Report

What would it cost to build here?

Enter any U.S. address. Get the build cost and land options, every figure sourced.

Build Type
Vacant Land Search
More details (optional)
Report ID: FCT-CA-2026-8841As of: 2026-10-24Coverage: PlusSHA-256: 9b4e7c2108a4f6d3…
Neighborhood / Municipal Jurisdiction LevelHome Build · 2,400 sf · 2 stories

Silver Lake Neighborhood, City of Los Angeles, Los Angeles County, CA

Coverage depth statement: Plus coverage (California) — Federal layer (FEMA, Census, USGS, BLS, HUD) + LADBS permit valuation dataset & state condition tables live.

Permitting authority: Los Angeles Department of Building and Safety (LADBS)
Zoning & dimensional envelope: R1-1 / RD1.5-1XL Hillside & Infill Residential: 45%–50% maximum lot coverage, 15 ft front / 5 ft side / 15 ft rear setbacks, 28–33 ft height cap, Title 24 energy & solar mandate.

Total build cost (building, fees and buffer)

$832,020

$347/sf · Range: $732,178 – $965,143

Total Project Cost Including Vacant Land ($540,000 site)

$1,372,020 ($572/sf all-in)

All-in range: $1,207,378 – $1,618,984

See the full breakdown

01 · Land you could buy

Modeled · LA County Assessor vacant infill parcel roll & Silver Lake 90026/90039 land comps

Estimated local vacant land band: $460,000 – $650,000 (midpoint $540,000). Representative parcels matching 2,400 sf residential criteria:

Candidate Parcel / CorridorLot SizeZoningUtilities & Site NoteConfidenceEst. Land Price
Candidate Infill Lot A — Silver Lake Hillside (90039)Silver Lake North / Moreno Highlands · LA County Assessor Parcel Roll & ZIMAS Zoning Profile0.14 acres (6,100 sf)R1-1 (Single-Family / ADU-eligible)LADWP water & power at street; hillside sewer lateral check requiredPublic Record$485,000$79.50/sf land
Candidate Flat Pad Lot B — Sunset Junction Corridor (90026)Silver Lake South / Sunset Junction · LA County Assessor Parcel Roll & ZIMAS Zoning Profile0.16 acres (7,000 sf)RD1.5-1XL (Low-Medium Residential)Level pad; existing curb cut, municipal water, sewer & gas at frontagePublic Record$540,000$77.14/sf land
Candidate View Lot C — Silver Lake Reservoir East (90026)Silver Lake East · LA County Assessor Parcel Roll & Silver Lake Land Valuation Band0.19 acres (8,250 sf)R1-1-VL14% slope; caisson/grade-beam hillside foundation allowance appliesModeled$635,000$76.97/sf land

02 · Building costs by trade

Subtotal: $660,000 ($275/sf)

03 · Fees and other costs (design, permits, survey, insurance)

Subtotal: $94,800 ($39.50/sf)

04 · Buffer for surprises and price rises

$77,220
  • • Design & field contingency (7.5% = $49,500): Modeled pre-final-drawing scope reserve referenced against Flyvbjerg pre-feasibility dispersion.
  • • Material & labor escalation (4.2% = $27,720): Modeled against BLS PPI Inputs to Construction & CA prevailing/market trade wage trend.

05 · Local Condition Flags (Flood, Soil, Zoning, Utilities & Labor)

Flood & Drainage HazardClearPublic Record

FEMA NFHL Panel 06037C1605F: Zone X (minimal flood hazard). City of LA Low Impact Development (LID) stormwater capture barrels/planters required.

Source: FEMA NFHL & LA Sanitation LID Manual

Seismic & Soils / Hillside GradingFlagPublic Record

Seismic Design Category D/E (Hollywood / Raymond Fault proximity). Requires engineered shear walls/moment frame and site-specific geotechnical report.

Source: USGS Seismic Design Maps & California Geological Survey

Zoning, FAR & Hillside OverlayDiligence requiredPublic Record

ZIMAS R1-1 / RD1.5-1XL: Verify Baseline Mansionization / Baseline Hillside Ordinance RFA (Residential Floor Area) ratio prior to schematic lock.

Source: City of Los Angeles ZIMAS (zimas.lacity.org)

Utilities & Solar MandateFlagPublic Record

California Title 24 requires rooftop solar PV on new homes; LADWP transformer load check required when upgrading to 200A–400A all-electric service.

Source: CEC Title 24 & LADWP Electric Service Requirements

Regional Labor & Material MarketFlagPublic Record

LA Metro skilled residential framing, MEP, and concrete trade wages sit 38% above the U.S. median per BLS OES.

Source: U.S. Bureau of Labor Statistics (BLS OES — Los Angeles-Long Beach-Anaheim MSA)

06 · What still requires a local licensed professional

  • • Licensed California Geotechnical Engineer: exploratory borings and LADBS Soils Report approval letter.
  • • Licensed Land Surveyor: boundary survey, slope-band analysis, and prevailing front-yard setback calculation.
  • • California Licensed Architect / Structural Engineer: stamped plans and Title 24 energy compliance forms.
  • • LADWP & LA Sanitation: hydrant flow test (if required for NFPA 13D sprinklers) and sewer lateral dye/video inspection.

07 · Primary sources & verification record

Report ID: FCT-CA-2026-8841 · SHA-256: 9b4e7c2108a4f6d312e58c9b07124a8f631c0d9e8b7a5412c3f0e1a9d8b7c654 · Verify this record at /verify

Factum Report sample: 1,200 sf ADU in Pasadena, total $158,400
Specimen FCT-CA-2026-3660 · verifiable

How this is calculated

We read public records and local cost data. Every figure gets a label that says where it came from. Each result gets a report ID that anyone can check.Report ID with a SHA-256 hash, checked at /verify

Try a sample place

Public record

Read straight from a government dataset, a city fee list, a flood map, or a wage and price series.

FEMA NFHL, BLS OES/PPI, BCA/URA, CIDB/JKR

Declared on the permit

What owners told the city the job was worth, on issued building permits nearby.

Modeled

Worked out from regional cost splits and local price levels when nearby records are thin.

Fallback

A state or national baseline, used when a rural area publishes no local data.

Model-assisted floor

Factum Report is an independent cost bureau. It is not a licensed appraiser, estimator, architect or engineer. It does not predict who wins a bid. Anyone can check a result at factumreport.com/verify. You can also try Singapore or Malaysia, or see coverage.

Know the true cost before you build.