Skip to content
Factum Report · The public recordfactumreport.com
Factum ReportFactum Report

A clearer view of your building costs.

Start with an address, a plan or a quote. We check public records and label every figure. Where local records are thin, we say the figure is estimated.

One real file

  • Built from public records
  • Every figure names its source
  • Official agency data only
  • Anyone can verify the report
Factum Report sample: 1,200 sf ADU in Pasadena, total $158,400
Specimen FCT-CA-2026-3660 · verifiable

One report. A clear path.

Start with 1, 2 and 11. Free.

Cost · The headline cost and its labeled basis.

Start free →

Full findings require the full report. Inside views appear when available.

Where each number comes from

Public record

A dated public record.

Declared

Stated on a permit, not final cost.

Modeled

Calculated with stated assumptions.

Fallback

State or national baseline when local records are too thin.

Start a free check

Files stored privately · Sec 01, 02 & 11 free
Try a 1-click preview:

How report verification works →

Know the true cost before you build.