Trust
What changed, with dates.
Method, product and site changes that a serious reader might want to check. This is not a list of customers, revenue or certifications — those are not claimed.
Method versions used in an issued file are also listed on the method page. Accuracy revisions are dated on /accuracy.
23 November 2026
Typography, phone tables and a server-rendered home hero
Body and display fonts ship only in 400 weight, and only those two faces are preloaded. Wide tables stack as labelled cards under 600 pixels. The homes / institutions toggle on the home page is CSS, so this week's offer is in the first HTML. The Free Score remains a small client island.
23 November 2026
Diligence pack, first-screen citation, live offer line
A printable due-diligence pack publishes the official mission verbatim, what is live this week, and the claims we do not make. Score results lead with the record count and source basis. Terms, the institutions hero and pricing use one availability line, including that paid lender files are not on sale today.
22 November 2026
CM-1 held-out rule and dated predictions
The trained cost model is used only where it beat the rules on held-out projects. Dated predictions for Texas and Indiana road contracts are published before bids open and scored after. Misses stay public.
22 November 2026
Public project cost records
Public project cost records from public sources only were added to the corpus and the accuracy page. Gaps in those sets are listed.
21 November 2026
Free Score preview
The free result shows the Grade, the range, public data points and the top two reasons. The rest stays in the full file.
20 November 2026
Pricing FP-1.0
Prices scale with the cost of the build, from $49 to from $35,000, quoted by scope.
19 November 2026
Value FV-1.0, Grade FG-1.0, File FF-1.0
The fair-cost range, the Grade out of 100 (Excellent 80–100, Good 60–79, Fair 40–59, Poor 0–39) and the file format with checksum.