Early access · Integrations
Site monitoring partners.
Factum Report does not run cameras or fly drones. Progress feeds come from partner camera and drone systems already on site, and land in the project record beside the budget and the draw they support.
Early access. Factum Report intends to work with providers of site cameras, 360° capture and drone mapping. No partnership exists yet, so no provider is named here. Until then, any system that can make an HTTPS request can post progress with a project feed key, and teams can upload photos and percent complete by hand.
How construction intelligence fits together
01
Quantities by trade from the model or drawing, checked by a person.
02
Public-record unit prices for the market, with gaps shown.
03
Firms found in public records, shortlisted for each package.
04
Bids levelled on one rule book, with a recommendation and its reasons.
05
Budget, schedule, change orders and draw requests for owner, lender and contractor.
06
Site progress
Photos from the team, and progress from partner camera and drone systems.
07
Each draw checked against the budget and the progress on record, again whenever either changes.
What partners provide
Fixed site cameras
Time-lapse and scheduled images of the whole site. Good for showing that work happened and when.
360° walk capture
Floor-by-floor images from routine site walks. Partner systems that compare them with the model report percent complete by trade and area.
Drone mapping
Aerial surveys for earthworks, structure and roofs. Partner systems report quantities in place and progress.
The progress feed
The project owner makes a feed key in the project record. The key works for that one project and can be revoked at any time. The partner system posts:
POST https://factumreport.com/api/v1/projects/{projectId}/progress
Authorization: Bearer frfeed_...
Content-Type: application/json
{
"source": "site camera 2",
"capturedAt": "2026-11-20T08:00:00Z",
"items": [
{ "packageId": "pkg-03", "percent": 45,
"note": "Level 2 slab poured",
"imageUrls": ["https://partner.example/img/123.jpg"] }
]
}- Percent complete is recorded as the partner system reports it, with the source named. Factum Report does not estimate progress from images.
- Images stay with the partner; the record keeps the links. Team photos uploaded by hand are stored privately and shown only to project members.
- Every post is written to the project audit trail, and every open draw request is checked again.
- Up to 50 items per post; 60 requests a minute.
Provide site cameras, 360° capture or drone mapping and want to connect? Write to malik@factumreport.com.