Market intelligence
Where construction costs are moving.
Public price indices, permit values and bid prices. Each figure names its publisher and window.
Factum Report is building the trusted intelligence layer for construction — essentially, Kelley Blue Book meets a credit report for the construction industry. We turn fragmented data into source-backed reports and cost intelligence. The long-term vision is to become the industry's central platform for evaluating, planning and managing construction projects.
Live public series
Fetched from the publishers on this server, cached for 6 hours, and labelled with the source and the period of the latest point. These feeds do not replace the evidence graph below. If a feed does not answer, this page says so rather than fill the gap.
Lumber and wood products
WPU08 · U.S. Bureau of Labor Statistics · 2026-10-01
314.824 index · 3 mo -0.4% · YoY +5.8%
BLS Public Data API v2, no key. Preliminary months are subject to revision.
Iron and steel
WPU101 · U.S. Bureau of Labor Statistics · 2026-10-01
392.522 index · 3 mo +4.8% · YoY +25.1%
BLS Public Data API v2, no key. Preliminary months are subject to revision.
Plastic construction products
WPU0721 · U.S. Bureau of Labor Statistics · 2026-10-01
356.76 index · 3 mo -0.5% · YoY +5.7%
BLS Public Data API v2, no key. Preliminary months are subject to revision.
Rubber and plastic products
WPU07 · U.S. Bureau of Labor Statistics · 2026-10-01
270.002 index · 3 mo 0.0% · YoY +5.8%
BLS Public Data API v2, no key. Preliminary months are subject to revision.
Light fuel oils
WPU0573 · U.S. Bureau of Labor Statistics · 2026-10-01
607.533 index · 3 mo +38.2% · YoY +115.4%
BLS Public Data API v2, no key. Preliminary months are subject to revision.
Total U.S. construction spending
TTLCONS · Federal Reserve Bank of St. Louis (FRED), republishing Census / BLS series · 2026-09-01
2,186,145 USD millions, SAAR · 3 mo -0.1% · YoY -2.7%
Fetched from the public FRED CSV download (no API key).
Private residential construction spending
PRRESCONS · Federal Reserve Bank of St. Louis (FRED), republishing Census / BLS series · 2026-09-01
848,777 USD millions, SAAR · 3 mo -3.8% · YoY -8.9%
Fetched from the public FRED CSV download (no API key).
New private housing units authorized
PERMIT · Federal Reserve Bank of St. Louis (FRED), republishing Census / BLS series · 2026-10-01
1,295 thousands of units, SAAR · 3 mo -9.6% · YoY -8.7%
Fetched from the public FRED CSV download (no API key).
PPI: materials and components for construction
WPUSI012011 · Federal Reserve Bank of St. Louis (FRED), republishing Census / BLS series · 2026-10-01
381.552 index · 3 mo +1.7% · YoY +12.1%
Fetched from the public FRED CSV download (no API key).
PPI: ready-mix concrete manufacturing
PCU327320327320 · Federal Reserve Bank of St. Louis (FRED), republishing Census / BLS series · 2026-10-01
402.369 index · 3 mo 0.0% · YoY +2.4%
Fetched from the public FRED CSV download (no API key).
Foreign exchange against the US dollar
- 1 USD = 0.91216 EURReference rate · Frankfurter, European Central Bank reference rates · as of 2026-11-24
- 1 USD = 0.76348 GBPReference rate · Frankfurter, European Central Bank reference rates · as of 2026-11-24
- 1 USD = 4.1155 MYRReference rate · Frankfurter, European Central Bank reference rates · as of 2026-11-24
- 1 USD = 1.2899 SGDReference rate · Frankfurter, European Central Bank reference rates · as of 2026-11-24
- 1 USD = 3.64 QAROfficial published peg · Qatar Central Bank official USD peg (in force since 2001) · as of 2001-07-01
- 1 USD = 3.75 SAROfficial published peg · Saudi Central Bank (SAMA) official USD peg (in force since 1986) · as of 1986-01-01
EUR, GBP, MYR and SGD are ECB reference rates via Frankfurter. QAR and SAR are official published pegs, not market quotes. Frankfurter does not quote QAR or SAR.
Machine copy: /api/v1/live
Construction-materials prices
U.S. Bureau of Labor Statistics producer price indices. The Factum Value time adjustment uses an equal-weight basket of WPU08, WPU101, WPU0721 applied to 40% of hard cost, a stated assumption labelled Modeled. Basket year on year: +10.7% to 2026-09-01.
Light fuel oils
WPU0573 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 636.707 · 3 mo +42.5% · YoY +115.4%
Rubber and plastic products
WPU07 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 269.079 · 3 mo -0.1% · YoY +5.5%
Synthetic rubber
WPU0711 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 276.12 · 3 mo -3.8% · YoY +9.6%
Plastic construction products
WPU0721 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 355.051 · 3 mo +0.1% · YoY +4.6%
Lumber and wood products
WPU08 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 315.329 · 3 mo +1.3% · YoY +5.5%
Iron and steel
WPU101 · U.S. Bureau of Labor Statistics · 2026-09-01
Level 383.33 · 3 mo +5.0% · YoY +20.7%
Building permits
U.S. Census Bureau Building Permits Survey series on file.
California residential building permits, units
2026-09-01
3 mo — · YoY —
Washington residential building permits, units
2026-09-01
3 mo — · YoY —
California residential building permits, valuation ($000)
2026-09-01
3 mo — · YoY —
Washington residential building permits, valuation ($000)
2026-09-01
3 mo — · YoY —
Bids against engineers' estimates
Texas Department of Transportation lettings, 4,270 projects, 2024-10-08 to 2026-11-12. Low bid ÷ engineer's estimate, project-weighted. Under 1.00 means bids came in under the estimate. Ratios outside 0.4 to 2.5 are left out.
| Quarter | Low bid ÷ estimate | Projects |
|---|---|---|
| 2024-Q4 | 0.89 | 338 |
| 2025-Q1 | 0.89 | 560 |
| 2025-Q2 | 0.85 | 461 |
| 2025-Q3 | 0.83 | 566 |
| 2025-Q4 | 0.86 | 475 |
| 2026-Q1 | 0.90 | 474 |
| 2026-Q2 | 0.94 | 514 |
| 2026-Q3 | 0.90 | 618 |
| 2026-Q4 | 0.91 | 216 |
By district, latest quarter
- Abilene: 2026-Q4 · 0.88 · 6 projects
- Amarillo: 2026-Q4 · 0.94 · 8 projects
- Atlanta: 2026-Q4 · 1.00 · 16 projects
- Austin: 2026-Q4 · 1.00 · 8 projects
- Brownwood: 2026-Q4 · 0.93 · 10 projects
- Bryan: 2026-Q4 · 0.98 · 7 projects
- Childress: 2026-Q4 · 0.97 · 7 projects
- Corpus Christi: 2026-Q4 · 0.92 · 5 projects
- Dallas: 2026-Q4 · 0.73 · 31 projects
- Fort Worth: 2026-Q4 · 0.78 · 8 projects
- Houston: 2026-Q4 · 1.03 · 16 projects
- Laredo: 2026-Q4 · 0.98 · 5 projects
- Lubbock: 2026-Q4 · 0.85 · 6 projects
- Lufkin: 2026-Q4 · 0.95 · 11 projects
- Odessa: 2026-Q4 · 0.89 · 9 projects
- Paris: 2026-Q4 · 0.90 · 11 projects
- Pharr: 2026-Q4 · 0.92 · 7 projects
- San Antonio: 2026-Q4 · 0.87 · 6 projects
- Tyler: 2026-Q4 · 1.07 · 9 projects
- Waco: 2026-Q4 · 0.90 · 13 projects
Unit-price movement: state DOT pay items
Median bid unit price, year against year, for the busiest pay items with at least eight bids in each year. Source: state DOT bid tabulations (first public-agency source).
| Item | Unit | From | To | Change |
|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | DAY | 2025: $178 (n=1152) | 2026: $150 (n=1103) | -15.5% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 2025: $4,000 (n=1000) | 2026: $3,500 (n=920) | -12.5% |
| 505-7003 TMA (MOBILE OPERATION) | DAY | 2025: $200 (n=596) | 2026: $100 (n=598) | -50.0% |
| 672-7004 REFL PAV MRKR TY II-A-A | EA | 2025: $6 (n=518) | 2026: $5 (n=457) | -13.3% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | DAY | 2025: $100 (n=471) | 2026: $87 (n=456) | -13.0% |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | LF | 2025: $1 (n=404) | 2026: $1 (n=410) | -4.8% |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | LF | 2025: $4 (n=398) | 2026: $4 (n=408) | -5.9% |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | LF | 2025: $1 (n=432) | 2026: $1 (n=370) | -17.4% |
| 168-7001 VEGETATIVE WATERING | TGL | 2025: $30 (n=392) | 2026: $25 (n=360) | -16.7% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2025: $8,500 (n=382) | 2026: $6,099 (n=364) | -28.2% |
| 500-7002 MOBILIZATION (CALLOUT) | EA | 2025: $75 (n=378) | 2026: $100 (n=320) | +33.3% |
| 672-7002 REFL PAV MRKR TY I-C | EA | 2025: $6 (n=358) | 2026: $5 (n=327) | -16.7% |
| 644-7073 REMOVE SM RD SN SUP&AM | EA | 2025: $112 (n=342) | 2026: $110 (n=331) | -1.3% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | EA | 2025: $3,333 (n=353) | 2026: $3,400 (n=319) | +2.0% |
| 666-7024 REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 2025: $1 (n=317) | 2026: $1 (n=321) | -4.3% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | LF | 2025: $1 (n=311) | 2026: $1 (n=294) | 0.0% |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 2025: $750 (n=317) | 2026: $733 (n=276) | -2.2% |
| 672-7006 REFL PAV MRKR TY II-C-R | EA | 2025: $6 (n=278) | 2026: $5 (n=299) | -9.3% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | CY | 2025: $700 (n=286) | 2026: $650 (n=289) | -7.1% |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 2025: $9 (n=285) | 2026: $8 (n=287) | -13.3% |
Band movement by trade
Item cells whose median moved since the previous computation, grouped by trade. The median change across items is shown for each trade.
Permit Valuation · 7 items · median -1.3%
- Connecticut · Institutional Avg Value per Permit (EA): $54,812 → $54,095 (-1.3%)
- North Carolina · Institutional Avg Value per Permit (EA): $35,642 → $34,715 (-2.6%)
- Nebraska · Institutional Avg Value per Permit (EA): $44,008 → $43,639 (-0.8%)
- Washington · Institutional Avg Value per Permit (EA): $50,033 → $48,918 (-2.2%)
- Pennsylvania · Commercial Avg Value per Permit (EA): $31,539 → $30,309 (-3.9%)
Drainage Pipe · 3 items · median -1.7%
- California · PVC Pipe (LF): $278 → $280 (+0.6%)
- Texas · HDPE Pipe (LF): $42 → $40 (-5.5%)
- Texas · PVC Pipe (LF): $112 → $110 (-1.7%)
HMA · 3 items · median -2.5%
- Texas · HMA Base Course (TON): $150 → $146 (-2.5%)
- Texas · SMA Surface (TON): $168 → $165 (-1.7%)
- Texas · HMA Surface Course (TON): $128 → $117 (-8.6%)
Aggregate Base · 2 items · median -1.7%
- California · Aggregate Base Course (CY): $241 → $240 (-0.6%)
- Kentucky · Crushed Aggregate Base (TON): $42 → $41 (-2.8%)
Guardrail · 2 items · median -0.2%
- California · Guardrail (LF): $115 → $116 (+1.3%)
- Kentucky · Guardrail (LF): $15 → $15 (-1.7%)
Earthwork · 2 items · median +17.5%
- Texas · Embankment (CY): $30 → $33 (+10.0%)
- Texas · Unclassified Excavation (CY): $80 → $100 (+25.0%)
PCC Pavement · 2 items · median -2.0%
- Texas · Continuously Reinforced PCC Pavement (SY): $138 → $136 (-1.8%)
- Texas · PCC Pavement (SY): $15 → $15 (-2.2%)
Traffic Control · 2 items · median -0.1%
- Texas · Traffic Control Devices (EA): $260 → $257 (-1.0%)
- Nebraska · Traffic Control Devices (EA): $20 → $20 (+0.8%)
Permit cost cells that moved: Rhode Island CI-IS-PV-002 -0.9% · Vermont CI-IS-PV-002 -0.6% · Florida CI-IS-PV-001 +0.7% · North Carolina CI-IS-PV-002 +0.6% · Virginia CI-IS-PV-002 -0.5% · Alabama CI-IS-PV-001 +0.5% · Tennessee CI-IS-PV-002 -0.9% · Iowa CI-IS-PV-001 +0.7%.
Permit valuations by place and type
Declared value per square foot from city permit records, last 24 months. Declared permit values are a floor, not a final cost. Where one figure dominates, the city is applying a valuation table, and the group is used as a cross-check only.
| Place | Type | Permits | P10 / median / P90 per sf | Note |
|---|---|---|---|---|
| Fort Worth, TX; Austin, TX | Single-family homes · new | 3,758 | $79 / $150 / $154 | 50% at exactly $150/sf: valuation table |
| Fort Worth, TX; San Antonio, TX; Austin, TX | Commercial buildings · new | 1,599 | $40 / $103 / $751 | |
| Fort Worth, TX; Austin, TX | Apartments · new | 435 | $28 / $124 / $1,663 | |
| Fort Worth, TX; Austin, TX | Other buildings · alteration | 367 | $32 / $119 / $410 | |
| Fort Worth, TX; Austin, TX; San Antonio, TX | Tenant improvements · alteration | 357 | $27 / $144 / $806 | |
| San Antonio, TX | Tenant improvements · new | 253 | $25 / $115 / $318 | |
| Austin, TX; Fort Worth, TX | Retail buildings · new | 73 | $83 / $258 / $739 | |
| Fort Worth, TX; Austin, TX | Industrial buildings · new | 56 | $41 / $111 / $841 | |
| Austin, TX; San Antonio, TX; Fort Worth, TX | Other buildings · new | 42 | $39 / $167 / $832 |
Confirmed unit prices that moved
- Kentucky · ASPHALT RESURFACING (NULL) · Kentucky Transportation Cabinet: 2025 $523,376 → 2026 $649,345 (+24.1%)
- Kentucky · PAVEMENT (WITH ALTERNATES) (NULL) · Kentucky Transportation Cabinet: 2025 $477,221 → 2026 $510,724 (+7.0%)
- Kentucky · ASPHALT SEAL AGGREGATE (TON) · Kentucky Transportation Cabinet: 2025 $104 → 2026 $195 (+88.1%)
- Kentucky · ASPHALT SEAL COAT (TON) · Kentucky Transportation Cabinet: 2025 $1,108 → 2026 $2,050 (+85.0%)
- Kentucky · REMOVE GUARDRAIL (LF) · Kentucky Transportation Cabinet: 2024 $5 → 2025 $4 (-11.8%)
- Kentucky · GRADE & DRAIN WITH ASPHALT SURFACE (NULL) · Kentucky Transportation Cabinet: 2025 $3,331,168 → 2026 $6,130,358 (+84.0%)
- Kentucky · DGA BASE (TON) · Kentucky Transportation Cabinet: 2025 $48 → 2026 $53 (+11.2%)
- Kentucky · CL2 ASPH SURF 0.38D PG64-22 (TON) · Kentucky Transportation Cabinet: 2025 $140 → 2026 $185 (+31.6%)
- Kentucky · ASPHALT MATERIAL FOR TACK (TON) · Kentucky Transportation Cabinet: 2025 $500 → 2026 $375 (-25.0%)
- Kentucky · TEMPORARY SIGNS (SF) · Kentucky Transportation Cabinet: 2025 $15 → 2026 $10 (-36.4%)
- Kentucky · ASPHALT MATERIAL FOR TACK NON-TRACKING (TON) · Kentucky Transportation Cabinet: 2025 $800 → 2026 $540 (-32.5%)
- Kentucky · EDGE KEY (LF) · Kentucky Transportation Cabinet: 2025 $50 → 2026 $47 (-6.8%)
- Iowa · TEMPORARY BARRIER RAIL, CONCRETE (LF) · Iowa Department of Transportation: 2025 $22 → 2026 $19 (-13.6%)
- Kentucky · TRAFFIC BOUND BASE (TON) · Kentucky Transportation Cabinet: 2024 $117 → 2026 $66 (-43.1%)
- Kentucky · GUARDRAIL END TREATMENT TYPE 1 (EA) · Kentucky Transportation Cabinet: 2024 $4,000 → 2025 $3,608 (-9.8%)
Evidence tables
- PermitObservation: 31,931 rows
- PublicBuildingAward: 2,321 rows
- BidObservation: 152,998 rows
- BandSnapshot: 4 rows
- ValidationExhibit: 4 rows
- BacktestCase: 11 rows
- IndexSeries: not loaded