91,977 project records from government awards, airport grants, highway bids and mine studies filed with the SEC, covering 20 countries. Each one links to where it was published. No commercial cost database is used.

Look up a project

Describe the asset with its size: floor area for a building (sq ft or m2), miles or km for a road, throughput for a mine (t/d or Mt/yr), MW for a power plant, length and width for a runway. You get the records behind it, the range they support, and how that range scored on records it had not seen.

Records by asset type

These project records are part of the 239,758 public cost records on file. Costs are moved to today’s prices with BLS PPI, New school building construction (PCU236222236222) for buildings and BLS PPI, Net inputs to other nonresidential construction, goods (WPUIP2312301) for civil works, mines and power (2026-10).

Records by asset type
Asset typeRecords
Highway pay items (Oregon and Hawaii bids)42,400
Roads and bridges5,326
Other buildings4,310
Water, dams and ports4,305
Other works4,209
Hospitals and clinics2,058
Airports (other works)1,881
Offices1,860
Utilities and pipelines1,689
Housing and barracks1,128
Oil and gas pipelines1,081
Industrial buildings874
Parks, sport and recreation830
Warehouses and storage659
Mines458
Schools and training451
Airport runways (per sq yd)411
Power and energy works252
Laboratories106
Rail91
LNG plants and terminals7
Gas processing plants4
Refineries and renewable fuels2
Petrochemical plants1
Airport grants (other AIP work)17,584
Power generation, EIA published averages (not counted as records)547

Records by country

Where the work is. U.S. federal awards for work outside the United States are shown as one group; mine studies cover projects worldwide.

United States 70,063 · US federal award, overseas 2,680 · Singapore 1,241 · Canada 74 · Mexico 26 · Chile 9 · Argentina 9 · Brazil 6 · Australia 4 · Ghana 4 · Peru 3 · Guatemala 3 · Ecuador 3 · Senegal 2 · Colombia 2 · Burkina Faso 2 · Tanzania 2 · Mali 1 · Greece 1 · Namibia 1 · Romania 1

Oil, gas, LNG and pipelines

1,070 U.S. natural gas pipeline projects with a reported cost, miles and diameter, from the EIA pipeline projects workbook, give a cost per inch-mile. 25 LNG, refinery, gas processing, petrochemical and liquids pipeline project costs were read by hand from company announcements filed with the SEC; each is one project’s stated budget or estimate, not a final cost. No government publishes refinery, LNG or offshore field costs project by project, so this set stays small and is shown as comparables.

Oil, gas and LNG project costs from company filings
ProjectTypeCountryCapacityStated costToday, USDFiled
Birch-to-Taylor Expansion (95 km)Pembina Pipeline · capital budgetOil and gas pipelinesCanada120,000 bpdCAD 310M$223M2026-11-05
Fox Creek-to-Namao ExpansionPembina Pipeline · capital budgetOil and gas pipelinesCanada70,000 bpdCAD 200M$159M2026-02-27
Cedar LNG (floating)Pembina Pipeline · Class III estimate, gross; excludes ~US$0.6B interest during construction and transaction costsLNG plants and terminalsCanada3.3 MtpaUSD 3,400M$3,754M2026-02-27
Louisiana LNG (foundation, 3 trains)Woodside Energy · LNG project cost incl. EPC, owner's cost and contingency (~$960/t); $17.5B incl. pipeline and reserveLNG plants and terminalsUnited States16.5 MtpaUSD 15,900M$17,800M2025-11-05
US Energy Corp gas processing facilityU.S. Energy Corp. · capital cost estimateGas processing plantsUnited States17 MMcf/dUSD 15M$17M2025-05-12
Rio Grande LNG Phase 1 (3 trains)TotalEnergies · capex of first phase as stated by TotalEnergiesLNG plants and terminalsUnited States17.5 MtpaUSD 14,800M$16,844M2023-08-01
Southeast Gateway offshore gas pipeline (715 km)TC Energy · 1.3 Bcf/d; estimated cost at FIDOil and gas pipelinesMexicoNot statedUSD 4,500M$5,159M2022-11-09
Woodfibre LNGEnbridge · total project cost, liquefaction and floating storageLNG plants and terminalsCanadaNot statedUSD 5,100M$5,730M2022-07-29
KRIA tranche 2 shallow-cut gas plantPembina Pipeline · includes associated infrastructureGas processing plantsCanada100 MMcf/dCAD 165M$198M2020-02-28
Port Arthur refinery coker and sulfur recovery unitValero Energy · board-approved total costRefineries and renewable fuelsUnited States55,000 bpdUSD 975M$1,521M2018-10-25
Driftwood LNG (full plant)Tellurian · guaranteed lump-sum turnkey EPC contract with BechtelLNG plants and terminalsUnited States27.6 MtpaUSD 15,200M$23,912M2018-08-08
Duvernay I shallow-cut gas plantPembina Pipeline · gross, incl. supporting infrastructureGas processing plantsCanada100 MMcf/dCAD 125M$166M2017-05-05
Wood Buffalo ExtensionEnbridge · definitive cost estimate before optimizationOil and gas pipelinesCanadaNot statedCAD 1,800M$2,418M2015-07-31
RIO Pipeline (107 miles)Delek US · estimated total project costOil and gas pipelinesUnited States55,000 bpdUSD 125M$215M2015-07-01
Sabine Pass Liquefaction Stage 2 (Trains 3-4)Cheniere Energy · EPC contract valueLNG plants and terminalsUnited StatesNot statedUSD 4,103M$7,149M2015-04-08
Sabine Pass Liquefaction Trains 5-6Cheniere Energy · capex estimate before FIDLNG plants and terminalsUnited StatesNot statedUSD 6,000M$9,798M2014-04-07
Saturn II NGL extraction facilityPembina Pipeline · expected costGas processing plantsCanada200 MMcf/dCAD 170M$254M2014-02-27
Southern Access (Line 61) expansion to 1.2 million bpdEnbridge Energy Management · estimated cost incl. tankageOil and gas pipelinesUnited StatesNot statedUSD 1,250M$2,063M2014-02-18
Norlite diluent pipelineEnbridge · estimated costOil and gas pipelinesCanada270,000 bpdCAD 1,400M$2,278M2013-11-06
Lake Charles ethane crackerSasol · estimated US$5-7 billion (midpoint shown); 1.5 Mt/yr ethylenePetrochemical plantsUnited States1.5 MtpaUSD 6,000M$9,957M2013-06-07
Woodland Pipeline Extension (385 km, 36-inch)Enbridge · estimated C$1.0-1.4 billion (low end shown)Oil and gas pipelinesCanada400,000 bpdCAD 1,000M$1,610M2013-05-08
Line 78, 76-mile 36-inch twin, Flanagan to GriffithEnbridge Energy Management · estimated costOil and gas pipelinesUnited StatesNot statedUSD 495M$818M2013-02-15
Athabasca Pipeline twin (345 km, 36-inch)Enbridge · estimated costOil and gas pipelinesCanadaNot statedCAD 1,200M$2,003M2012-08-02
Flanagan South PipelineEnbridge · revised estimate (was US$1.9B before upsizing)Oil and gas pipelinesUnited States585,000 bpdUSD 2,800M$4,642M2012-05-09
Wood River refinery Coker and Refinery Expansion (CORE)Cenovus Energy · total capital cost at completion, grossRefineries and renewable fuelsUnited StatesNot statedUSD 3,800M$6,300M2012-03-20

Mines

458 mine projects with an initial capital figure, from technical report summaries (S-K 1300) and study results filed with the SEC, including Canadian and Australian companies that file there. 306 state a throughput. These are company study estimates, not as-built costs. Countries: Not stated 256, Canada 63, United States 61, Mexico 25, Argentina 9, Chile 9, Brazil 6, Australia 4, Ghana 4, Ecuador 3, Guatemala 3, Peru 3, Tanzania 2, Senegal 2. Commodities: gold 269, copper 42, silver 37, uranium 23, lithium 21, not stated 10, rare earth 8, graphite 6, diamond 6, zinc 5.

Download the mine records (CSV) · API

Mine records, newest first
ProjectCommodity · methodCountryStudy · filedThroughputInitial capital (today, USD)
PitarrillaENDEAVOUR SILVER CORPsilver · undergroundMexicoFS · 2026-11-194,000 t/day$585MUSD 585M as filed
Albany GraphiteZentek Ltd.graphite · open pitCanadaPEA · 2026-11-17—$817MUSD 817M as filed
BoumadineAya Gold & Silver Inc.lead · underground—PEA · 2026-11-178,000 t/day$463MUSD 463M as filed
WarintzaSolaris Resources Inc.gold · undergroundEcuadorFS · 2026-11-13—$3,700MUSD 3,700M as filed
Assessment ProcessCanagold Resources Ltd.gold · undergroundCanadaFS · 2026-11-13—$250MUSD 250M as filed
MossGold X2 Mining Inc.gold · open pit—PEA · 2026-11-13—$1,441MCAD 2,001M as filed
GunnisonGunnison Copper Corp.copper · open pitUnited StatesPEA · 2026-11-132,449 t/day$1,556MUSD 1,555.6M as filed
TransparencyIntegra Resources Corp.gold · open pitUnited StatesFS · 2026-11-12—$389MUSD 389M as filed
NussirBlue Moon Metals Inc.copper · underground—FS · 2026-11-126,000 t/day$184MUSD 184M as filed
QueenswayNew Found Gold Corp.gold · open pit + undergroundCanadaPEA · 2026-11-1212,000 t/day$150MUSD 149.8M as filed
ArrowNexGen Energy Ltd.uranium · undergroundCanadaFS · 2026-11-101,300 t/day$936MCAD 1,300M as filed
Grey FoxMcEwen Inc.— · underground—PFS · 2026-11-09—$181MUSD 180.8M as filed
South RailroadEquinox Gold Corp.gold · undergroundUnited StatesStudy · 2026-11-093,698 t/day$436MUSD 436M as filed
GoldrushBARRICK MINING CORPcopper · undergroundUnited StatesStudy · 2026-11-0938,356 t/day$1,000MUSD 1,000M as filed
Los ReyesTorex Resources Inc.gold · underground—PEA · 2026-11-065,000 t/day$515MUSD 514.8M as filed
Wheeler RiverDENISON MINES CORP.uranium · undergroundCanadaStudy · 2026-11-05—$419MUSD 419.4M as filed
EvaHARMONY GOLD MINING CO LTDgold · —AustraliaFS · 2026-10-3049,315 t/day$222MUSD 222M as filed
Lynn LakeALAMOS GOLD INCgold · undergroundCanadaStudy · 2026-10-292,000 t/day$937MUSD 937M as filed
FranklinSTANDARD LITHIUM LTD.lithium · —United StatesPEA · 2026-10-20—$3,496MUSD 3,496M as filed
ConverseSSR MINING INC.gold · ——PEA · 2026-10-13—$900MUSD 900M as filed
ElkNIOCORP DEVELOPMENTS LTDscandium · undergroundCanadaPFS · 2026-09-253,047 t/day$1,852MUSD 1,849M as filed
AlbanyZentek Ltd.graphite · open pit—PFS · 2026-09-242,703 t/day$818MUSD 817M as filed
Santa CruzIvanhoe Electric Inc.copper · undergroundUnited StatesFS · 2026-09-2320,000 t/day$1,432MUSD 1,430M as filed
CarangasNEW PACIFIC METALS CORPsilver · open pitCanadaPFS · 2026-09-2322,000 t/day$646MUSD 644.5M as filed
Pilot Mountain TungstenGuardian Metal Resources PLCtungsten · —United StatesStudy · 2026-09-174,000 t/day$289MUSD 288.7M as filed
South West ArkansasSTANDARD LITHIUM LTD.lithium · ——DFS · 2026-09-08—$3,506MUSD 3,500M as filed
Life-of-mineGold X2 Mining Inc.gold · open pitCanadaPEA · 2026-08-2730,137 t/day$1,480MCAD 2,001M as filed
KatanningOceanaGold Corpgold · open pitAustraliaDFS · 2026-08-179,863 t/day$256MAUD 355M as filed
Johnson TractContango Silver & Gold Inc.gold · undergroundCanadaIA · 2026-08-146,849 t/day$219MUSD 213.6M as filed
DeLamarIntegra Resources Corp.gold · open pitUnited StatesFS · 2026-08-1127,000 t/day$400MUSD 389M as filed
MesquiteEquinox Gold Corp.gold · open pit—Study · 2026-08-0512,700 t/day$448MUSD 436M as filed
Young-DavidsonALAMOS GOLD INCgold · undergroundMexicoFS · 2026-07-3020,000 t/day$172MUSD 165M as filed
Kabanga NickelLifezone Metals Ltdnickel · undergroundTanzaniaFS · 2026-07-299,315 t/day$981MUSD 942M as filed
BrookRamaco Resources, Inc.coal · —United StatesStudy · 2026-07-297,205 t/day$3,332MUSD 3,200M as filed
JorgeGoldMining Inc.gold · open pitBrazilPFS · 2026-07-225,500 t/day$210MUSD 202M as filed
Cerro PrietoGoldgroup Mining Inc.gold · open pit—PFS · 2026-07-204,000 t/day$16MUSD 15.5M as filed
Grassy MountainParamount Gold Nevada Corp.gold · undergroundUnited StatesFS · 2026-07-141,089 t/day$198MUSD 189.8M as filed
Diamba SudFORTUNA MINING CORP.gold · open pitSenegalFS · 2026-07-136,849 t/day$414MUSD 397.5M as filed
HammerdownNew Found Gold Corp.gold · open pitCanadaPEA · 2026-07-061,400 t/day$161MUSD 155M as filed
Chaarat ZAAVSILVERCORP METALS INCgold · underground—Study · 2026-06-305,000 t/day$19MUSD 18.1M as filed
El DomoSILVERCORP METALS INC— · —EcuadorStudy · 2026-06-29—$297MUSD 283.7M as filed
SleeperParamount Gold Nevada Corp.gold · open pit—FS · 2026-06-2330,000 t/day$211MUSD 201M as filed
MozParamount Gold Nevada Corp.gold · open pit—PFS · 2026-06-23—$211MUSD 201M as filed
McIlvenna BayELDORADO GOLD CORP /FIcopper · underground—PFS · 2026-06-114,900 t/day$1,034MUSD 987.4M as filed
Hill Rare EarthCrown PropTech Acquisitionsrare earth · ——DFS · 2026-06-10—$341MUSD 325.5M as filed
La MinaGoldMining Inc.gold · open pitColombiaPFS · 2026-06-0815,000 t/day$548MUSD 523M as filed
HycroftHYCROFT MINING HOLDING CORPgold · open pit + undergroundUnited StatesPFS · 2026-06-0251,801 t/day$2,513MUSD 2,400M as filed
Hope BayAGNICO EAGLE MINES LTDgold · underground—PEA · 2026-05-196,000 t/day$2,480MUSD 2,400M as filed
IntegratedDENISON MINES CORP.uranium · underground—PFS · 2026-05-14—$620MUSD 600M as filed
Courageous LakeSEABRIDGE GOLD INCgold · open pitCanadaPFS · 2026-05-137,500 t/day$1,572MUSD 1,522M as filed
SunshineSunshine Silver Mining & Refining Cosilver · undergroundUnited StatesIA · 2026-05-11907 t/day$296MUSD 286.9M as filed
La Colorada SkarnPAN AMERICAN SILVER CORPsilver · underground—PEA · 2026-05-0715,000 t/day$1,963MUSD 1,900M as filed
Eagle MountainMako Mining Corp.gold · open pit—PFS · 2026-04-295,000 t/day$101MUSD 95.6M as filed
Whistler Gold-CopperU.S. GoldMining Inc.gold · open pitUnited StatesIA · 2026-04-1740,000 t/day$1,353MUSD 1,278.6M as filed
Fenn-GibMAYFAIR GOLD CORP.gold · open pit—PFS · 2026-04-144,800 t/day$476MUSD 450M as filed
ZgounderAya Gold & Silver Inc.silver · open pit—PEA · 2026-04-133,326 t/day$472MUSD 446M as filed
RobustAya Gold & Silver Inc.gold · open pit—PEA · 2026-04-138,000 t/day$472MUSD 446M as filed
TerroneraENDEAVOUR SILVER CORPgold · undergroundMexicoStudy · 2026-04-132,000 t/day$243MUSD 230M as filed
SolidU.S. GOLD CORP.gold · open pit—FS · 2026-04-03—$417MUSD 394M as filed
Eau ClaireFURY GOLD MINES LTDgold · underground—PEA · 2026-03-31—$234MUSD 217M as filed
EskaySkeena Resources Ltdgold · open pit—DFS · 2026-03-318,219 t/day$553MCAD 713M as filed
ValentineEquinox Gold Corp.gold · open pitCanadaPFS · 2026-03-30—$446MUSD 414M as filed
Government PermitsOsisko Development Corp.gold · underground—Study · 2026-03-30—$949MUSD 881M as filed
Phoenix ISR UraniumDENISON MINES CORP.uranium · —CanadaFS · 2026-03-30—$646MUSD 600M as filed
Furnas Copper-GoldEro Copper Corp.gold · underground—PEA · 2026-03-3036,986 t/day$1,400MUSD 1,300M as filed
AvinoAVINO SILVER & GOLD MINES LTDgold · —MexicoStudy · 2026-03-272,250 t/day$53MUSD 49.1M as filed
QiqavikALAMOS GOLD INCgold · undergroundCanadaFS · 2026-03-269,000 t/day$178MUSD 165M as filed
ArthurAngloGold Ashanti PLCgold · open pitUnited StatesPFS · 2026-03-2634,247 t/day$4,765MUSD 4,424M as filed
InfrastructureWestern Copper & Gold Corpgold · open pitArgentinaPFS · 2026-03-26120,000 t/day$3,899MUSD 3,620M as filed
La Yaqui GrandeALAMOS GOLD INCgold · open pit + undergroundCanadaStudy · 2026-03-2611,900 t/day$178MUSD 165M as filed
Concept The QueenswayNew Found Gold Corp.gold · open pit + underground—PFS · 2026-03-25700 t/day$167MUSD 154.8M as filed
LostUR-ENERGY INCuranium · ——IA · 2026-03-12—$50MUSD 46.5M as filed
KemessCenterra Gold Inc.gold · open pit + undergroundCanadaStudy · 2026-03-1050,000 t/day$103MUSD 96M as filed
Blackwater Project HemiPERPETUA RESOURCES CORP.antimony · open pit—FS · 2026-02-23—$2,446MUSD 2,215M as filed
Camino RojoOrla Mining Ltd.gold · undergroundMexicoFS · 2026-02-208,000 t/day$671MUSD 608.1M as filed
Milligan PFS OutlinesCenterra Gold Inc.gold · open pit + underground—PFS · 2026-02-1966,300 t/day$278MUSD 252M as filed
Taxes Lyon CountyLION COPPER & GOLD CORP.copper · ——PFS · 2026-02-18—$799MUSD 724M as filed
OdysseyAGNICO EAGLE MINES LTDgold · underground—Study · 2026-02-1320,000 t/day$298MUSD 270M as filed
DonlinNOVAGOLD RESOURCES INCgold · open pitUnited StatesPFS · 2026-01-2253,500 t/day$10,338MUSD 9,233M as filed
Execution-ReadyOrla Mining Ltd.gold · ——FS · 2026-01-21—$213MUSD 190M as filed
ExtendedKINROSS GOLD CORPgold · underground—Study · 2026-01-154,800 t/day$448MUSD 400M as filed
Era DoradaAura Minerals Inc.gold · undergroundGuatemalaFS · 2026-01-051,600 t/day$428MUSD 382.1M as filed
Flagship PhoenixDENISON MINES CORP.lead · ——FS · 2026-01-02—$672MUSD 600M as filed
Florida CanyonIntegra Resources Corp.gold · open pitUnited StatesPFS · 2025-12-182,500 t/day$439MUSD 389M as filed
Kilbourne GraphiteTitan Mining Corpgraphite · open pit—Study · 2025-12-15—$176MUSD 155.8M as filed
After-taxAura Minerals Inc.gold · undergroundGuatemalaFS · 2025-12-08—$431MUSD 382M as filed
EstimateNew Found Gold Corp.copper · ——FS · 2025-11-21—$84MUSD 75M as filed
PanucoVizsla Silver Corp.gold · undergroundCanadaFS · 2025-11-193,288 t/day$267MUSD 238.7M as filed
SpringpoleFirst Mining Gold Corp.gold · open pitCanadaFS · 2025-11-1830,000 t/day$390MUSD 348.6M as filed
Environmental ApprovalLithium Argentina AGlithium · —ArgentinaStudy · 2025-11-14—$1,232MUSD 1,100M as filed
Kindersley LithiumDENISON MINES CORP.lithium · underground—PEA · 2025-11-07—$470MUSD 419.4M as filed
Rhyolite Ridge Lithium-Boronioneer Ltdlithium · ——Study · 2025-10-298,219 t/day$17MUSD 15M as filed
ToroparuAris Mining Corpgold · open pit—PFS · 2025-10-2919,178 t/day$923MUSD 820M as filed
Tonopah FlatsAMERICAN BATTERY TECHNOLOGY Colithium · open pit—Study · 2025-10-1633,973 t/day$231MUSD 205.6M as filed
Advances Diamba SudFORTUNA MINING CORP.gold · open pit—DFS · 2025-10-156,849 t/day$319MUSD 283.2M as filed
Confirms Economically RobustMcEwen Inc.copper · —ArgentinaFS · 2025-10-09—$3,567MUSD 3,170M as filed
EwoyaaSayona Mining Ltdlithium · open pitGhanaDFS · 2025-09-16—$303MUSD 270M as filed
High-GradeAris Mining Corpgold · underground—PFS · 2025-09-033,500 t/day$702MUSD 625M as filed
MatawinieNouveau Monde Graphite Inc.graphite · open pit—FS · 2025-08-11—$467MUSD 415M as filed
OptimizedNew Found Gold Corp.gold · open pit + underground—Study · 2025-08-08700 t/day$174MUSD 155M as filed
GryphonDENISON MINES CORP.uranium · undergroundCanadaPFS · 2025-08-08—$286MUSD 254M as filed
Fort Cady5E Advanced Materials, Inc.boron · ——DFS · 2025-08-07—$413MUSD 367M as filed
YellowheadTASEKO MINES LTDcopper · open pitCanadaStudy · 2025-08-0790,000 t/day$261MUSD 232M as filed
GoldfieldCenterra Gold Inc.gold · open pit—Study · 2025-08-06—$283MUSD 252M as filed
IndicativeDENISON MINES CORP.uranium · ——PEA · 2025-08-06—$286MUSD 254M as filed
YeringtonLION COPPER & GOLD CORP.copper · open pit—PFS · 2025-08-0641,096 t/day$814MUSD 724M as filed
LocalNexGen Energy Ltd.uranium · ——FS · 2025-08-06—$1,461MUSD 1,300M as filed
IslandALAMOS GOLD INCgold · undergroundMexicoFS · 2025-07-3120,000 t/day$75MUSD 67M as filed
Well-DefinedVISTA GOLD CORPgold · —AustraliaFS · 2025-07-2915,000 t/day$478MUSD 425M as filed
NorthLifezone Metals Ltdnickel · undergroundTanzaniaFS · 2025-07-189,315 t/day$1,061MUSD 943M as filed
GramaloteB2GOLD CORPgold · open pitColombiaFS · 2025-07-1497,000 t/day$833MUSD 740M as filed
Rare EarthRamaco Resources, Inc.rare earth · ——PEA · 2025-07-10—$651MUSD 579M as filed
GibraltarTASEKO MINES LTDcopper · open pitCanadaPFS · 2025-07-1090,000 t/day$2,250MUSD 2,000M as filed
WharfDakota Gold Corp.gold · open pitUnited StatesFS · 2025-07-077,000 t/day$432MUSD 384M as filed
Rhyolite Ridgeioneer Ltdlithium · ——FS · 2025-06-13—$1,882MUSD 1,667.9M as filed
CaribooOsisko Development Corp.gold · undergroundCanadaFS · 2025-06-124,900 t/day$994MUSD 881M as filed
ErnestoAura Minerals Inc.gold · —BrazilFS · 2025-06-093,562 t/day$121MUSD 107M as filed
BullfrogENERGY FUELS INCuranium · underground—PFS · 2025-06-03—$62MUSD 55M as filed
WildcatIntegra Resources Corp.gold · open pitUnited StatesPEA · 2025-05-14—$130MUSD 115M as filed
ThompsonCenterra Gold Inc.molybdenum · open pit—PFS · 2025-05-0652,575 t/day$450MUSD 397M as filed

The newest 120 are shown; the CSV holds all 458.

Airport runways

411 FAA grants for rehabilitating or reconstructing the only paved runway at an airport, divided by the runway’s area from FAA records. Rehabilitation: $3.64–$83.48 per sq yd (median $15.28, 303 grants). Reconstruction: $3.98–$184.42 (median $24.59, 108 grants). Grants carry the federal share only.

Power generation

Published averages from EIA Form EIA-860, generators installed in 2024, today’s prices: Solar $2,151/kW · Battery storage $1,694/kW · Wind $2,170/kW · Natural gas $1,158/kW · Petroleum liquids $1,229/kW. Grants and tax credits are excluded by EIA.

Stadiums, data centres and offshore platforms

11 large projects with a published cost, each from a public owner, state body or company filing. Stadium costs are final or at completion; data centre and offshore costs are announced or set at the investment decision, and are labelled so. Older costs are moved to today’s prices with the named BLS price index.

Large project cost records
ProjectPlaceCost (year)TodayBasisSource
U.S. Bank StadiumMinneapolis, Minnesota$1,100M (2016)$1,962MTotal cost as published by the venue (owner: Minnesota Sports Facilities Authority)U.S. Bank Stadium (Minnesota Sports Facilities Authority), 2018-01
Mercedes-Benz StadiumAtlanta, Georgia$1,500M (2017)$2,616MConstruction value stated by the builder at a Georgia state board meeting (owner: Georgia World Congress Center Authority)Georgia State Workforce Development Board, 2017-11-09
Allegiant StadiumLas Vegas, Nevada$1,970M (2020)$3,078MFinal building construction cost (Las Vegas Stadium Authority)Las Vegas Stadium Authority, 2020-09-17
Highmark StadiumOrchard Park, New York$2,100M (2026)$2,100MCost at completion announced by New York StateOffice of the Governor of New York, 2026-06-23
New Nissan Stadium (under construction)Nashville, Tennessee$2,230M (2026)$2,230MEstimated total construction cost in a city internal audit; not final, not used in the per-seat bandMetropolitan Nashville Office of Internal Audit, 2026-06-10
Polaris Forge 1 (Applied Digital)Ellendale, North Dakota$4,800M (2026)$4,800MCompany's anticipated capex of $11M to $13M per MW of critical IT load, 400 MW (SEC filing); midpoint shownU.S. Securities and Exchange Commission (Applied Digital filing), 2026-04
Vantage VA4 campusStafford County, Virginia$2,000M (2025)$2,000MInvestment announced by the Governor of Virginia; three buildings, 929,000 sq ft, 192 MWOffice of the Governor of Virginia (as reported by Potomac Local), 2025-11-06
Meta data centre campusBeaver Dam, Wisconsin$1,000M (2025)$1,000MInvestment of more than $1 billion announced with the state economic development agency; over 700,000 sq ftWisconsin Economic Development Corporation, 2025-11-12
AVAIO Digital Taurus campusBrandon, Mississippi$6,000M (2025)$6,000MInvestment announced by the Governor of Mississippi; size not statedOffice of the Governor of Mississippi, 2025-08-19
Mad Dog Phase 2 (Argos platform), bpGulf of America, offshore Louisiana$9,000M (2016)$11,668MCost at final investment decision announced by the company; up to 140,000 barrels of oil a daybp (company announcement), 2016-12
Anchor, ChevronGulf of America, offshore Louisiana$5,700M (2019)$6,894MCost at final investment decision announced by the company; 75,000 barrels of oil a dayChevron (company announcement), 2019-12

Per unit, today’s prices, lowest to highest: stadiums $29,544–$47,354 per seat (4 records); data centres $10.4M–$13.0M per MW of IT load; offshore platforms $83,340–$91,919 per barrel a day of capacity. Few records: these are not statistical bands.

Highway pay-item bands from PDF bid tabs

Four state DOTs publish their bid tabulations only as PDFs. We read each PDF with pdftotext and keep the low bidder’s unit price for every pay item let since 2024-11-22. A band is published only with 20 or more low bids from 10 or more letting dates in one quantity range, and when the high (p90) is no more than 15 times the low (p10). These sit beside the Texas and Oregon bands, which come as data. Lump sums, dollar items and estimates are left out.

PDF bid tab sources by state
PublisherPDFs readContractsLow-bid linesLetting datesBands published
Washington State DOT1371174,00358, 2025-01-29 to 2026-11-181
Connecticut DOT20413911,51868, 2024-12-04 to 2026-10-287
Indiana DOT3269948,67526, 2024-12-11 to 2026-09-09396
New Jersey DOT99996,66557, 2025-07-10 to 2026-06-231

Indiana prints dozens of contracts in each monthly letting, so most of its common items reach the bar. Connecticut, New Jersey and Washington let fewer contracts with the same item at the same size, so few of their items qualify yet. Washington tabs give line numbers, not item codes, so its bands match on the exact item name. New York’s bid tab site asks automated readers to stay out (robots.txt), so it is not read.

Washington State DOT: 1 published band
ItemQuantityLow · median · highBidsSource PDFs
ESC LEADESC LEAD8 to under 16 DAY$27.5 · $133 · $22526 from 20 lettings24A025, 25B006 and 24 more
Connecticut DOT: 7 published bands
ItemQuantityLow · median · highBidsSource PDFs
0969062CONSTRUCTION FIELD OFFICE, MEDIUM8 to under 16 MO.$3,886.5 · $5,012.5 · $6,51046 from 32 lettings0172-0540, 0171-0512 and 42 more
0978002TRAFFIC DRUM128 to under 256 EA.$7.4 · $75 · $92.629 from 27 lettings0172-0540, 0170-3736 and 27 more
0979003CONSTRUCTION BARRICADE TYPE III8 to under 16 EA.$150 · $172.5 · $245.122 from 17 lettings0170-3736, 0173-0548 and 20 more
098110042'' TRAFFIC CONE128 to under 256 EA.$40 · $43.75 · $5921 from 20 lettings0172-0540, 0171-0512 and 19 more
1220027CONSTRUCTION SIGNS512 to under 1,024 S.F.$10 · $23.78 · $42.536 from 31 lettings0171-0512, 0170-3737 and 34 more
1220027CONSTRUCTION SIGNS256 to under 512 S.F.$7.78 · $25 · $4030 from 27 lettings0172-0540, 0046-0131-R1 and 28 more
0969062CONSTRUCTION FIELD OFFICE, MEDIUM16 to under 32 MO.$3,200 · $4,800 · $5,46035 from 29 lettings0053-0196, 0094-0264 and 31 more
Indiana DOT: 396 published bands
ItemQuantityLow · median · highBidsSource PDFs
107-09367INSPECTION HOLE, 3 FT DEEP OR LESS2 to under 4 EACH$195 · $760 · $1,68220 from 12 lettingsB -39043-A, B -43226-A and 10 more
202-02240PAVEMENT REMOVAL512 to under 1,024 SYS$20.07 · $50 · $6033 from 17 lettingsB -39043-A, B -42175-A and 15 more
203-02000EXCAVATION, COMMON256 to under 512 CYS$30 · $64.13 · $93.859 from 16 lettingsB -39043-A, B -42795-A and 14 more
207-09935SUBGRADE TREATMENT, TYPE IC1,024 to under 2,048 SYS$30 · $40 · $55.972 from 19 lettingsB -39043-A, B -39418-B and 17 more
214-12239GEOTEXTILE FOR PAVEMENT, TYPE 2B1,024 to under 2,048 SYS$3.29 · $5 · $7.9144 from 17 lettingsB -39043-A, B -42175-A and 15 more
301-12234COMPACTED AGGREGATE, NO. 5364 to under 128 CYS$57.8 · $92.43 · $15827 from 13 lettingsB -39043-A, B -42829-A and 11 more
302-06464SUBBASE FOR PCCP64 to under 128 CYS$103.07 · $150 · $211.550 from 18 lettingsB -39043-A, B -42829-A and 16 more
303-01180COMPACTED AGGREGATE, NO. 5364 to under 128 TON$45 · $68 · $11063 from 19 lettingsB -39043-A, B -42829-A and 17 more
306-08034MILLING, ASPHALT, 1 1/2 IN.1,024 to under 2,048 SYS$3.5 · $6.5 · $13.2531 from 16 lettingsB -39043-A, R -44764-A and 14 more
401-000005QC/QA-HMA, 3, 58H, SURFACE, 9.5 mm128 to under 256 TON$131.75 · $182.5 · $24326 from 16 lettingsB -39043-A, B -42240-A and 14 more
401-000047QC/QA-HMA, 3, 58S, BASE, 25.0 mm256 to under 512 TON$104.36 · $128.5 · $175.442 from 16 lettingsB -39043-A, B -39418-B and 14 more
601-02241GUARDRAIL, REMOVE512 to under 1,024 LFT$2 · $5 · $9.463 from 18 lettingsB -39043-A, B -42175-A and 16 more
601-12281GUARDRAIL, MGS W-BEAM, 6 FT 3 IN. SPACING128 to under 256 LFT$19 · $22 · $26.140 from 15 lettingsB -39043-A, B -43340-A and 13 more
601-12289GUARDRAIL HEIGHT TRANSITION, MGS2 to under 4 EACH$850 · $950 · $1,36035 from 17 lettingsB -39043-A, B -42174-A and 15 more
601-12292GUARDRAIL TRANSITION, MGS WITHOUT CURB4 to under 8 EACH$2,850 · $3,275 · $3,70073 from 18 lettingsB -39043-A, B -42175-A and 16 more
601-94689GUARDRAIL END TREATMENT, TYPE OS1 to under 2 EACH$2,445 · $3,125 · $3,70547 from 16 lettingsB -39043-A, B -42174-A and 14 more
609-06259REINFORCED CONCRETE BRIDGE APPROACH, 12 IN.256 to under 512 SYS$153.5 · $200 · $264.552 from 18 lettingsB -39043-A, B -42829-A and 16 more
616-06405RIPRAP, REVETMENT256 to under 512 TON$58.1 · $87.8 · $14962 from 20 lettingsB -39043-A, B -42842-A and 18 more
621-01004MOBILIZATION AND DEMOBILIZATION FOR SEEDING2 to under 4 EACH$214 · $500 · $1,000196 from 21 lettingsB -39043-A, B -39418-B and 19 more
621-02770EROSION CONTROL BLANKET512 to under 1,024 SYS$2.2 · $2.75 · $531 from 15 lettingsB -39043-A, R -43004-A and 13 more
628-09403FIELD OFFICE, TYPE C8 to under 16 MOS$1,330.52 · $3,000 · $4,144139 from 21 lettingsB -39043-A, B -42240-A and 19 more
628-11976COMPUTER SYSTEM EQUIPMENT2 to under 4 EACH$207.5 · $750 · $1,500196 from 21 lettingsB -39043-A, B -39418-B and 19 more
703-06029REINFORCING BARS, EPOXY COATED16,384 to under 32,768 LBS$1.46 · $2 · $2.3227 from 15 lettingsB -39043-A, B -43418-A and 13 more
706-11620CONCRETE BRIDGE RAILING TRANSITION, TYPE TFC4 to under 8 EACH$1,523.55 · $2,687.26 · $5,00066 from 17 lettingsB -39043-A, B -42832-A and 15 more
722-01066HYDRODEMOLITION1,024 to under 2,048 SYS$68.5 · $75 · $126.528 from 13 lettingsB -39043-A, B -42175-A and 11 more

See all 396 Indiana DOT bands, 50 a page

New Jersey DOT: 1 published band
ItemQuantityLow · median · highBidsSource PDFs
155018MFIELD OFFICE TYPE F SET UP1 to under 2 U$20,450 · $40,000 · $114,00034 from 26 lettings25119, 25121 and 32 more