Live demo

Watch a real construction budget get checked.

A public apartment budget, read line by line and checked against public cost data. Press play, or step through. No sign-up.

Live demo

Full sample fileSample · not for reliance

Choose a sample project

1 / 6 · Budget

Public recordReading 7 budget lines

Thornton & Post

Apartments or multifamily · 109,135 sq ft · 3900 Thornton Avenue, Fremont, CA

  1. Construction CostsHard · Staff report CA-25-702$61,879,344
  2. Architectural/EngineeringSoft · Staff report CA-25-702$3,421,117
  3. Const. Interest, Perm. FinancingSoft · Staff report CA-25-702$7,662,937
  4. Legal FeesSoft · Staff report CA-25-702$182,511
  5. Other CostsSoft · Staff report CA-25-702$7,430,041
  6. Construction Hard Cost ContingencyContingency · Staff report CA-25-702$4,702,077
  7. Land and AcquisitionLand · Staff report CA-25-702$7,555,974
  8. Budget total$92,834,001

Loan $69,198,994 · build time 20 months

Public budget lines from the California Tax Credit Allocation Committee and California Debt Limit Allocation Committee staff report, 10 December 2025, project CA-25-702. Staff report (PDF)

Sample only. Data-only review. Fixed rules compare the figures with public cost data. Not an issued Factum file and not for reliance.

Sample only. Data-only review. Fixed rules compare this public budget with public cost data. It is not an issued Factum file, not a close-out, and not for reliance. Use it to see how the review reads, then try it with a budget of your own.

A short walkthrough

Under a minute (0:56) on the live review, using the Thornton & Post sample. Silent, with captions. Loads only when you press play.

The project

Thornton & Post

116 apartments, new construction, at 3900 Thornton Avenue, Fremont, CA 94536. Construction expected to begin in May 2026 and be completed in January 2028.

Figures are from the California Tax Credit Allocation Committee and California Debt Limit Allocation Committee Project Staff Report, Qualified Private Activity Tax-Exempt Bond Project, 10 December 2025, project CA-25-702. That report is a cost summary at application. Staff noted that project costs are preliminary estimates. Construction loan sources below are the two Chase Bank construction lines only; grants, city funds and equity are not treated as the loan.

Official staff report (PDF).

What was entered

Each line is a published figure, a sum of named lines, or a quotient the report makes possible. The review total is $92,834,001, which is the hard, soft, contingency and land lines used here. The application total in the staff report is $100,563,697, because four published lines were left out of this typed stack, as listed below.

  • Hard cost$61,879,344

    Staff report line “Construction Costs.” The report also lists an “Estimated Hard Per Unit Cost” of $483,471 ($56,082,636 across 116 units). This sample uses the Construction Costs line, not that per-unit figure.

  • Floor area109,135 sq ft

    Not published as a standalone floor area. The staff report lists residential construction cost per square foot as $567. This sample uses $61,879,344 ÷ $567, rounded to 109,135 sq ft.

  • Contingency$4,702,077

    Staff report line “Construction Hard Cost Contingency.”

  • Soft costs$18,696,606

    Sum of four staff-report lines: Architectural/Engineering $3,421,117; Const. Interest, Perm. Financing $7,662,937; Legal Fees $182,511; Other Costs $7,430,041.

  • Land$7,555,974

    Staff report line “Land and Acquisition.”

  • Loan$69,198,994

    Chase Bank tax-exempt construction financing $27,145,799 plus Chase Bank taxable construction financing $42,053,195, both from the staff report’s construction-financing table.

  • Build time20 months

    The staff report’s expected start and finish: May 2026 to January 2028.

Published lines not entered as hard, soft, contingency, land or loan: Soft Cost Contingency $493,197 (A published contingency on soft costs; not added to the hard-cost contingency check.) Reserves $957,521 (Not treated as design, permit, fee or finance costs in this sample.) Developer Fee $5,000,000 (Left out of the typed soft-cost line.) Commercial Costs $1,278,978 (Left out of the residential hard/soft/land stack used here.)

Data-only review

Apartments or multifamily · 109,135 sq ft · 3900 Thornton Avenue, Fremont, CA

4 in line · 2 to watch · 0 flagged · 1 not checked

Public range: $11,532,435 to $54,799,229 (Published benchmark · Census benchmark · apartment buildings (5+ units) · California). Typed total $92,834,001.

  • Hard-cost budget against the public rangewatch

    $61,879,344 against $11,532,435 to $54,799,229

    Below the low end is flagged (the job may run short of money); above the high end is marked watch. Source: Published benchmark: Census benchmark · apartment buildings (5+ units) · California.

  • Hard cost per sq ftwatch

    $567 a sq ft against $106 to $502

    Same bands as the range, per sq ft. Source: Census benchmark · apartment buildings (5+ units) · California.

  • Contingency as a share of hard costin line

    7.6%

    New work: under 5.0% is marked watch and under 3.0% is flagged; over 20% is marked watch. Source: Factum rule book.

  • Soft costs as a share of hard costin line

    30.2%

    Expected 10.0% to 35.0% for this type; outside that is marked watch (design, permits, fees, finance may be missing or heavy). Source: Factum rule book.

  • Loan to total costin line

    74.5%

    Over 80% is marked watch and over 90% is flagged. Source: Factum rule book.

  • Build timenot checked

    20 months

    Checked for U.S. houses only for now. Source: —.

  • Budget lines givenin line

    hard, soft, contingency, land

    A budget without soft costs and contingency is marked watch. Source: Factum rule book.

Flags a credit officer would see

2 checks are marked watch: hard-cost budget against the public range, hard cost per sq ft. Those figures sit outside the Census apartment-building range for California. That range is a published benchmark for apartment buildings, not a bid set for Bay Area affordable housing. The staff report also notes a 130% high-cost adjustment. The review does not decide whether the budget is right; it flags the gap so a credit officer can ask what drives it (location, wage rules, scope, parking, commercial space, or the pricing date).

Contingency (7.6% of hard cost), soft costs (30.2% of hard cost) and loan to the typed total (74.5%) are in line with the rule book. Build time is not checked: the 20-month public schedule is shown, but this check currently runs on U.S. houses only.

Questions the review would put to the borrower

  1. The hard-cost budget sits outside the public range for this project. What drives the difference (scope, finishes, site work, pricing date)?
  2. The hard cost per sq ft is outside the usual band. Can you share the builder's quote or line-item budget that supports it?

Try it with your own budget

Type a borrower's budget into the same review. Or open this sample in the live form and change the figures.

Partner first-pass pack · $2,500

Ten first-pass cost files for internal use; your own staff check and sign. Each within 3 business days of the scope or plans. Starts this week. Full refund if a file can't be delivered. Unused credits refunded on request.

Factum Report is construction intelligence. This page is a worked sample of the free data-only lender review. It is not a professional cost opinion, an appraisal, or a document to rely on for a loan decision. The underlying public report remains the source for the project's own figures.