Factum Report
Free Score

Sample files · the range

One question, at every scale.

How much does this cost to build? Factum Report answers it the same way for a house after a flood and for a $27 billion data centre campus: every figure read from a dated public record or modeled from a stated assumption, and labeled as one or the other.

13

sample files, published 11 November 2026

$509K to $27B

smallest to largest cost to build

1,000+

checks in each major project file

2 countries

in this set: the United States and Singapore

Evaluate

Same method, from $509K to $27 billion

Each bar is the file's cost to build, on a log scale. The home files price a 2,000 sq ft rebuild. The major project files price the whole project, system by system, with the contracts, suppliers, schedule and risks from the public record.

Where

Where these samples sit

Factum Report covers the United States, Qatar, Malaysia, Singapore, and Saudi Arabia. This set of samples is drawn from two of them.

See the sources
  • United States

    12 sample files

    Texas, Washington, Florida, California, New Mexico, Pennsylvania, New York, Nevada, Louisiana, and the U.S. Gulf of Mexico.

  • Singapore

    1 sample file

    Tuas Port, Phases 1 and 2: reclamation, caisson wharf and terminal automation, priced in Singapore and U.S. dollars.

Home files · 11 pages each

Rebuild, build new, or renovate

Four homes on real blocks after a fire, a flood and two hurricanes. Each file prices the rebuild line by line, then lists the local rules, the permits and the timeline, every program and dollar of aid still open, and the builders to call. No single home is identified.

01 · Home file · rebuild, build new, renovate

Schreiner Street, Town Creek

Kerrville, Texas · United States

A 2,000 sq ft home lost in the July 2026 Hill Country flood.

Rebuild cost
$509K
Range $421K–$619K
Programs and money found
18
Time to move back in
9–15 months

FCT-TX-2026-H105 · 11 pages · sample

Cover of the Factum Report sample file FCT-TX-2026-H105: Schreiner Street, Town Creek, Kerrville, Texas.
Page from sample file FCT-TX-2026-H105: The block.
02 · The block
Page from sample file FCT-TX-2026-H105: The cost, line by line.
03 · The cost, line by line

02 · Home file · rebuild, build new, renovate

North Douglass Street

Spokane, Washington · United States

A 2,000 sq ft home lost in the August 2026 Spokane fires.

Rebuild cost
$674K
Range $566K–$852K
Programs and money found
17
Time to move back in
12–24 months

FCT-WA-2026-H104 · 11 pages · sample

Cover of the Factum Report sample file FCT-WA-2026-H104: North Douglass Street, Spokane, Washington.
Page from sample file FCT-WA-2026-H104: The block.
02 · The block
Page from sample file FCT-WA-2026-H104: The cost, line by line.
03 · The cost, line by line

03 · Home file · rebuild, build new, renovate

88th Avenue, Sunset Beach

Treasure Island, Florida · United States

A 2,000 sq ft home lost to Hurricanes Helene and Milton, rebuilt on piles.

Rebuild cost
$1.37M
Range $1.26M–$1.48M
Programs and money found
17
Time to move back in
18–30 months

FCT-FL-2026-H103 · 11 pages · sample

Cover of the Factum Report sample file FCT-FL-2026-H103: 88th Avenue, Sunset Beach, Treasure Island, Florida.
Page from sample file FCT-FL-2026-H103: The block.
02 · The block
Page from sample file FCT-FL-2026-H103: The cost, line by line.
03 · The cost, line by line

04 · Home file · rebuild, build new, renovate

Roca Chica Drive, Big Rock

Malibu, California · United States

A 2,000 sq ft hillside home lost in the Palisades Fire.

Rebuild cost
$3.00M
Range $2.56M–$3.88M
Programs and money found
19
Time to move back in
18–30 months

FCT-CA-2026-H102 · 11 pages · sample

Cover of the Factum Report sample file FCT-CA-2026-H102: Roca Chica Drive, Big Rock, Malibu, California.
Page from sample file FCT-CA-2026-H102: The block.
02 · The block
Page from sample file FCT-CA-2026-H102: The cost, line by line.
03 · The cost, line by line

Development file · 71 pages

73 apartments, San Antonio

Between the house and the power plant sits the Development file: a budget you can read before the land is bought. Sample file FCT-TX-2026-3662 puts the all-in cost at $15.89 million, or $217,688 a unit, and tests more than one way to own the same building.

Open the sample file
Cover of sample file FCT-TX-2026-3662.

Major project files · 42 to 45 pages each

Energy, transport, industry, and the cloud

Eight real, publicly documented projects. Each file sets the cost to build against the owner's latest budget, then breaks it down by engineering system, with a quantity takeoff, the public awards, the suppliers, a p10/p50/p90 schedule, comparables, risks and site conditions.

01 · Major project file · onshore well pad

Boundary Raider 6-18 Fed Com pad

Lea County, New Mexico · United States

A five-well Delaware Basin pad, from the road and pad through drilling, fracturing and water.

Cost to build · mid
$51.9M
Range $42.6M–$65.4M
Owner's latest budget
None published
Build time · p50
9 months
Checks in the file
1,085

FCT-US-2026-M108 · 42 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M108: Boundary Raider 6-18 Fed Com pad, Lea County, New Mexico.
Page from sample file FCT-US-2026-M108: The site.
02 · The site
Page from sample file FCT-US-2026-M108: Cost by engineering system.
05 · Cost by engineering system

02 · Major project file · power

Orange County Advanced Power Station

Bridge City, Texas · United States

A 1,215 MW combined-cycle gas plant, read from the utility's own cost exhibits.

Cost to build · mid
$1.46B
Range $1.38B–$1.67B
Owner's latest budget
$1.49B
Build time · p50
45 months
Checks in the file
1,090

FCT-US-2026-M105 · 43 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M105: Orange County Advanced Power Station, Bridge City, Texas.
Page from sample file FCT-US-2026-M105: The site.
02 · The site
Page from sample file FCT-US-2026-M105: Cost by engineering system.
05 · Cost by engineering system

03 · Major project file · airport

Pittsburgh International Airport, new landside terminal

Pittsburgh, Pennsylvania · United States

An 811,000 sq ft terminal with its garage, roads and bridges, from the airport authority's board records.

Cost to build · mid
$1.82B
Range $1.69B–$2.02B
Owner's latest budget
$1.70B
Build time · p50
49 months
Checks in the file
1,086

FCT-US-2026-M101 · 44 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M101: Pittsburgh International Airport, new landside terminal, Pittsburgh, Pennsylvania.
Page from sample file FCT-US-2026-M101: The site.
02 · The site
Page from sample file FCT-US-2026-M101: Cost by engineering system.
05 · Cost by engineering system

04 · Major project file · stadium

New Highmark Stadium

Orchard Park, New York · United States

A 60,000-seat open-air stadium with a snow-melting canopy.

Cost to build · mid
$2.10B
Range $1.64B–$2.59B
Owner's latest budget
$2.10B
Build time · p50
36 months
Checks in the file
1,096

FCT-US-2026-M102 · 45 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M102: New Highmark Stadium, Orchard Park, New York.
Page from sample file FCT-US-2026-M102: Cost by engineering system.
05 · Cost by engineering system
Page from sample file FCT-US-2026-M102: Construction schedule: p10, p50, p90.
07 · Construction schedule: p10, p50, p90

05 · Major project file · mine

Thacker Pass lithium mine and plant

Humboldt County, Nevada · United States

An open-pit lithium mine, a sulfuric acid plant and a 40,000-tonne-a-year carbonate plant.

Cost to build · mid
$3.18B
Range $2.61B–$3.77B
Owner's latest budget
$2.93B
Build time · p50
33 months
Checks in the file
1,092

FCT-US-2026-M104 · 44 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M104: Thacker Pass lithium mine and plant, Humboldt County, Nevada.
Page from sample file FCT-US-2026-M104: The site.
02 · The site
Page from sample file FCT-US-2026-M104: Cost by engineering system.
05 · Cost by engineering system

06 · Major project file · offshore platform

Argos floating production unit, Mad Dog field

U.S. Gulf of Mexico · United States

A deepwater semisubmersible platform, its 22 subsea wells and its export lines.

Cost to build · mid
$8.97B
Range $6.47B–$11.28B
Owner's latest budget
$9.00B
Build time · p50
56 months
Checks in the file
1,087

FCT-US-2026-M107 · 44 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M107: Argos floating production unit, Mad Dog field, U.S. Gulf of Mexico.
Page from sample file FCT-US-2026-M107: The site.
02 · The site
Page from sample file FCT-US-2026-M107: Cost by engineering system.
05 · Cost by engineering system

07 · Major project file · port

Tuas Port, Phases 1 and 2

Singapore

681 hectares of reclaimed land, 448 concrete caissons, 18 km of wharf and two automated terminals.

Cost to build · mid
$13.26B
Range $9.71B–$18.05B
Owner's latest budget
$5.60B, reclamation only
Build time · p50
90 months a phase
Checks in the file
1,084

FCT-SG-2026-M103 · 43 pages · sample

Cover of the Factum Report sample file FCT-SG-2026-M103: Tuas Port, Phases 1 and 2, Singapore.
Page from sample file FCT-SG-2026-M103: The site.
02 · The site
Page from sample file FCT-SG-2026-M103: Cost by engineering system.
05 · Cost by engineering system

08 · Major project file · data centre

Hyperion AI data centre campus

Richland Parish, Louisiana · United States

A 2 GW, 4 million sq ft hyperscale campus, with the power plants that serve it.

Cost to build · mid
$27.00B
Range $20.83B–$33.58B
Owner's latest budget
$27.00B
Build time · p50
54 months
Checks in the file
1,087

FCT-US-2026-M106 · 43 pages · sample

Cover of the Factum Report sample file FCT-US-2026-M106: Hyperion AI data centre campus, Richland Parish, Louisiana.
Page from sample file FCT-US-2026-M106: What the public record says it costs.
03 · What the public record says it costs
Page from sample file FCT-US-2026-M106: How it compares.
11 · How it compares

Why it matters

One record every party can read

Factum Report is building the trusted intelligence layer for construction — essentially, Kelley Blue Book meets a credit report for the construction industry. We turn fragmented data into source-backed reports and cost intelligence. The long-term vision is to become the industry's central platform for evaluating, planning and managing construction projects.

A lender, an insurer, a city and an owner each ask the same question about a project. These samples show that one method can answer it from a single home to a national port.

Get your Free Score · See posted prices · Read the method

These are sample files, not issued files. The major project files are prepared by Factum Report from public records on real, publicly documented projects as of 11 November 2026. They were not commissioned by, and are not endorsed by, the owner or any contractor named. Owners and contractors are named only as the public record names them.