Published samples
What should this project cost?
Published samples, not client cases. Each answers one decision.

Major project · United States
An 811,000 sq ft terminal with its garage, roads and bridges, from the airport authority's board records.
Pittsburgh International Airport, new landside terminal, Pittsburgh, Pennsylvania. The published sample reads $1.82B to build.
- Published cost
- $1.82B
- File
- FCT-US-2026-M101
- Pages
- 44

Major project · United States
An open-pit lithium mine, a sulfuric acid plant and a 40,000-tonne-a-year carbonate plant.
Thacker Pass lithium mine and plant, Humboldt County, Nevada. The published sample reads $3.18B to build.
- Published cost
- $3.18B
- File
- FCT-US-2026-M104
- Pages
- 44

Major project · Singapore
681 hectares of reclaimed land, 448 concrete caissons, 18 km of wharf and two automated terminals.
Tuas Port, Phases 1 and 2, Singapore. The published sample reads $13.26B to build.
- Published cost
- $13.26B
- File
- FCT-SG-2026-M103
- Pages
- 43

Major project · United States
A 1,215 MW combined-cycle gas plant, read from the utility's own cost exhibits.
Orange County Advanced Power Station, Bridge City, Texas. The published sample reads $1.46B to build.
- Published cost
- $1.46B
- File
- FCT-US-2026-M105
- Pages
- 43

Home file · United States
A 2,000 sq ft hillside home lost in the Palisades Fire.
Roca Chica Drive, Big Rock, Malibu, California. The published sample reads $3.00M to build.
- Published cost
- $3.00M
- File
- FCT-CA-2026-H102
- Pages
- 11

Home file · United States
A 2,000 sq ft home lost in the August 2026 Spokane fires.
North Douglass Street, Spokane, Washington. The published sample reads $674K to build.
- Published cost
- $674K
- File
- FCT-WA-2026-H104
- Pages
- 11
More published files
The San Antonio development sample, FCT-TX-2026-3662, can be read in full. A file ID lookup on this site does not validate a file.